My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006921
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2600 - Land Use Program
>
PA-0800005
>
SU0006921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:48 AM
Creation date
9/6/2019 9:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006921
PE
2627
FACILITY_NAME
PA-0800005
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25313019 26
ENTERED_DATE
1/24/2008 12:00:00 AM
SITE_LOCATION
30703 S MACARTHUR DR
RECEIVED_DATE
1/11/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\APPL.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH COND.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
730
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r) The project description on page 23 of the RCSI indicates that the facility plans to use a CTI <br /> system composting operation as part of the expansion.This type of operation requires the use <br /> of blowers to aerate the compost. Provide design information and calculations for the CTI <br /> system. <br /> s) The Project Description proposes to increase traffic to 1727 vehicles per day. The project <br /> description did not reference or provide a traffic study to support the proposed numbers. <br /> t) The Biomass Gasification Unit proposes to use 40 TPD of processed clean wood waste to <br /> generate 1 mega-watt/hour of energy for on-site use. The EHD needs more information on <br /> construction and operation of the biomass gasification unit and on the operation of clean wood <br /> waste recovery from the mixed C&D processing facility. Proper evaluation for this facility from <br /> the San Joaquin Valley Air Pollution Control District is required. <br /> u) Expand the outdoor green waste processing operations to allow the processing of co-collected <br /> residential green waste with food waste, to produce compost feedstock and/or anaerobic <br /> digestion feedstock. The EHD will need more information on additional reasonable measures <br /> to minimize odors, including feedstock characteristics and quality, and OIMP. <br /> v) The phased approach to this project does allow the facility to incrementally increase the <br /> capacity of the facility. The first phase of the project appears to be suitable for the size of the <br /> facility. The Environmental Health Department(EHD) has concerns regarding the second <br /> phase of the proposed project. Prior to implementing the second phase of the proposed project <br /> the proponent must conduct an operational analysis based on real time conditions at the site. <br /> Based on the review of the operational analysis the EHD may require additional equipment, <br /> quelling lanes and changes to onsite traffic patterns to insure safe operation of the facility, prior <br /> to the approval of Phase IL The operational analysis must be approved by the EHD 180 days <br /> prior to making application for a revised Solid Waste Facility Permit. <br /> 4) SAN JOAQUIN COUNCIL OF GOVERNMENTS(Staff Contact:Steve Mayo, (209)235-0600) <br /> a) This project is subject to the San Joaquin County Multi-Species Habitat Conservation and Open <br /> Space Plan (SJMSCP)and is located within the unmapped land use area. Per requirements of <br /> the SJMSCP, unmapped projects are subject to case-by-case review. Please contact the <br /> Council of Governments staff regarding the scheduling of a SJMSCP biologist to perform a pre- <br /> construction survey and any other mitigation measures.The pre-construction survey must be <br /> completed prior to any ground disturbance. This can be a 90-day process and it is <br /> recommended that the project applicant contact SJMSCP staff as early as possible. <br /> 5) AIRPORT LAND USE COMMISSION (Staff Contact: Laura Brunn, (209)-235-0600) <br /> a) New land uses that may cause visual, electronic, or increased bird strike hazards to aircraft in <br /> flight shall not be permitted within any airport's influence area; <br /> b) Glare or distracting lights which could be mistaken for airport lights, reflective materials are not <br /> permitted to be used in structures or signs(excluding traffic directional signs); <br /> c) Sources of dust,steam,or smoke which may impair pilot visibility; <br /> d) Sources of electrical interference with aircraft communications or navigation. No transmissions <br /> which would interfere with aircraft radio communications or navigational signals are permitted; <br /> e) Any proposed use, especially landfills and certain agricultural uses, that create an increased <br /> attraction for large flocks of birds; and <br /> Conditions of Approval -7 - PA-0800005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.