Laserfiche WebLink
Mitigation Measure Implementing Timing of <br /> Method of Verification Party Verification Monitoring Party <br /> • Unpaved Road Speeds:The <br /> construction contractor shall <br /> limit traffic speeds on unpaved <br /> roads to 15 mph. <br /> • Erosion Control: The <br /> construction contractor shall <br /> install gravelbags or other <br /> erosion-control measures to <br /> prevent silt runoff to public <br /> roadways from sites with a <br /> slope greater than 1 percent <br /> during ground-disturbing <br /> activities. <br /> • Wind Breaks: The construction <br /> contractor shall install and <br /> maintain wind breaks at <br /> windward side(s)of <br /> construction areas throughout <br /> construction activities. <br /> • High Winds:The construction <br /> contractor shall suspend <br /> excavation and grading activity <br /> when winds exceed 20 miles <br /> per hour. <br /> Construction Equipment <br /> All off-road construction equipment <br /> used within project area shall conform <br /> to the United States Environmental <br /> Protection Agency's Tier 3 or higher <br /> emissions standards.The construction <br /> contractor shall be made <br /> aware of this requirement prior to the <br /> start of construction activities. Use of <br /> Tier 3 or higher off-road construction <br /> equipment shall be stated on all <br /> grading plans. The construction <br /> contractor shall maintain a list of all <br /> operating equipment in use on the <br /> project site.The construction <br /> equipment list shall state the makes, <br /> models, and numbers of construction <br /> equipment onsite and shall be made <br /> available, upon request, to the San <br /> Joaquin Valley Air Pollution Control <br /> District. <br /> The construction contractor shall <br /> Conditions of Approval - 13 - PA-0800005 <br />