Laserfiche WebLink
Mitigation Measure Implementing Timing of <br /> Method of Verification Party Verification Monitoring Party <br /> properly service and maintain all <br /> construction equipment in accordance <br /> with the manufacturer's <br /> recommendations. <br /> dusters. <br /> The following mitigation will be i <br /> required: <br /> • Building doors shall be closed when <br /> not receiving materials. <br /> • Loaded transfer vehicles shall be <br /> covered and properly maintained to <br /> ensure that both liquid and solid <br /> waste materials are contained <br /> entirely within the vehicle for the <br /> duration of its transport. <br /> • Routine cleaning of floors,walls, and <br /> equipment shall be conducted per <br /> the requirements of CCR Title 27. <br /> • Odor complaints received by the City, !, <br /> County of San Joaquin <br /> Environmental Health Department <br /> (acting as the Local Enforcement <br /> Agency(LEA)for the State of <br /> California)or the SJVAPCD shall be <br /> responded to within 24 hours. This <br /> response shall include an inquiry into j <br /> the source of the odor and <br /> identification of the measures <br /> necessary to eliminate the odor <br /> source. If excessive complaints are <br /> received, as defined by the LEA, <br /> additional measures shall be <br /> implemented to control odors. <br /> Additional measures may include, <br /> but are not limited to: <br /> o install plastic curtains <br /> on entrances and exits <br /> to contain odors when <br /> doors are opened to <br /> allow vehicles to enter <br /> and exit; <br /> o use of deodorants to <br /> mask or neutralize <br /> odors as needed; <br /> o daily removal of waste I <br /> from tipping floor to <br /> allow for daily <br /> washing/cleaning. <br /> • The operator maintains an Odor <br /> Conditions of Approval - 14 - PA-0800005 <br />