Laserfiche WebLink
Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93.4 <br /> Page T <br /> l <br /> HAZARDSICONSTRAINTS: <br /> Elood'ma: <br /> Although the site Is not vithln a flood hazard zone,there Is the potential for Corral Hollow Creek, <br /> located north of the site, to overtop and spill into the site. The Final EIR Identified this as a <br /> POt8rd0Y sib impact and st,ggested as-midgation that germs be constructed to prevent <br /> a 100-year,244xxw flood In Corral Hollow Creek from accid <br /> Yng into the pit. As a <br /> Condition of Approval,the applicant will be <br /> required to prepare art analysis of Corral Hollow Creek <br /> for a 100=year, 24-hour flood evert Serming shah be consbwed K it is determined by the <br /> analysis to be necessary to protect the site. <br /> Hazardous Waste: - w <br /> The facility will be available for periodic household hazardous waste events sponsored by San <br /> Joaquin County. Ary hazardous materials discovered in the waste stream will be temporanly <br /> stored in a hazardous waste locker until disposed of off the site. The facility will accept recvclabie <br /> household hazardous materials such as used on, lead acid batteries, and antifreeze. These <br /> materialals will be labeled,stored at the site In special-bins and containers,and transported off the <br /> site by dealers In these commoffes. <br /> As required by the California integrated Waste Management Board,a toad screening program will _ <br /> be implemented at the transfer station. The facft will also not accent any hazardous commercial <br /> or Industrial waste. <br /> ENVIRONM, NTAL CONSIDERATIONS- <br /> All of the issues identified and analyzed in the EIR can be mitigated to less than significant levels. <br /> Therefore, a nStatement of Overriding Consideration"will not be required to take action on the project. <br /> Attachment A includes the findings necessary to certify the Final EIR as adequate. Attachment B contains <br /> the'Findings of Significant Environmental Impact,•and Attachment C is the Mitigation Monitoring program. <br />