Laserfiche WebLink
Item No.2 <br /> PC: 12-16-93 <br /> - ER-93-11UP-93-4 <br /> 'Page 6 <br /> the wood and yard waste promising and composttrtg ansa..and an refuse tipping, sorting and <br /> proCesskig will take place within the 30400t-deep excavated pit <br /> There are two primary types of land usas in the area surrounding the project site, gravel mining <br /> Old 200CIAMM.Ione Star IndusttISS operates a sort arxd gravel mkting facility west of the site, <br /> vith:TefCtiart A opertg a ill to the north. <br /> Directly across MacArthur Drive <br /> to ttte t are ends aad a ply used faor-row c raps. The.lop"to the south <br /> difni i8 V Wlrli. 00w la W Low i Efe am ktdudefields of row.crops and <br /> Ow fysLer.Tim Storage and ReOIdkVftdft to the wast. The Sara C2rbona Irrigation District <br /> Cared ruts along fire western boundary of the sate: Con'af Hallow Creek.Is also located north of <br /> the Site. <br /> There are few residences in the project area. The closest are the two mobile homes located <br /> across MacArthur Drive,approximately 600 feet.northeast of the site. There is also one residence <br /> aPpâ–ºmftatall.1,4 miles=Ah of the ske on the west's'Me of MacArthur Drive. There are also <br /> scaftW residerxtes at the kttersection of nro Road and MacArthur Drive, north of the site. <br /> The-F'mel ER corwkxied to ft project Is not Rely to create land use conflicts with surrounding <br /> utam either agrIcubrA rte,or mat rc:e extraction. The project will be enclosed with a <br /> sbt400t-high chain-mk fence and landscaped akxV MacArthur Drive. Also,except for the wood <br /> and yard waste processing and compostini;all other operations will take place inside the transfer <br /> starrionbulldirig. Ttd%.axaWned.wkh thepro)et' toot s in the bottom of the 3o-foot-deep pit, <br /> will rninirrze land use cordli . <br /> Property owners to the area were mailed =Km of Oran ER avaifab8ily, as well as project <br /> referrals. No comments from neighbors were redeived on the Draft SR, arW no comments <br /> regarcktg the Draft EIR were made by the one neighboring property owner present at the hearing <br /> on the gait EIR. <br /> Lgff5QrdAadorx <br /> The FkW EIR prepared for the project did not identify any significant traffic related impacts. The <br /> proposed project is expected to generate approximately 500 daily trips initially and approximately <br /> 1,100 dally trips in 2010. Since the trips will likely be dispersed over an entire day, according to <br /> the iFEIR there is dtrie relative impact to other users of the local transportation system. <br /> FACIIJTI MIRVICES, <br /> Drat e: <br /> Storm water runoff from all areas except the wood storage and yard waste composting area will <br /> drain to an on-site retention pond. Storm water runoff from the wood storage.and yard waste <br /> I compost area vinlj drain to an on-site fined evaporation pond water used for periodic wash down <br /> I of the trarefer station floor will be collected and directed to holding tanks for temporary storage <br /> until pumped out and hauled off the site for disposal. <br />