Laserfiche WebLink
Item No. 2 <br /> PC: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> Page 18 <br /> Liquids.leached from the received wastes and washdown waterused for periodic <br /> washdcwn of the transfer.station floor shall be directed into holding tanks or lined <br /> evaporation ponds. <br /> • Areas' be-curbed to contain petmteum products and hydraulic <br /> leans. Truck washlrV areas shall pe equipped With trenGe drains to collect waste water. <br /> D.2 PgLen 2E resources may result <br /> from crriirtetiDir erltsrit ttta _ afi* oi`iMe txoiect as a result d the <br /> lack orfalFure of impervious stand WON Inw6ftidwavigr."Corkamination of a public water <br /> suooiv aoutd occur. - — <br /> Magna: <br /> Changes or afteraCons have been required in, or hxorporated irtto, the project which avoid or. <br /> substard* lessen the significant environmental effect as identified in the Final:SR. <br /> M <br /> Statement of Fact: <br /> This impact will be.reduced by the following: <br /> • Mitigation measures detailed above for mitigating surface water impacts will also provide <br /> -mi igation for ground water impacts. - <br /> • Personnel working with the'Ioad screening program'and.on the tipping floor'shall have <br /> 40 hours of aSFIA training on spill contalorneM personal protective equipment, and the <br /> hanOing of recyclable household hazardous materials. <br /> • An approved hazardous materials storage area shah be provided at the facility for storage <br /> of hazardous wastes discovered as a result of load screening and processing. <br /> D.3. Potentilft Sigo§M Im . PLojW g2RMfi2Min ga adverse Irnpact to artificial water <br /> onving structures, in particular the Bagm-Carbone Infiaation Carat <br /> Findi <br /> Changes or alterations have been required In, or incorporated into, the project which avoid or <br /> substantially lessen the significant environmental effect as identified in the Final EER_ <br /> Statement of Fact: <br /> This impact will be reduced by the following: <br /> • Erosion control measures shall be implemented as detailed above to minimize soil loss <br /> and sedimentation during construction. <br /> -� Unpaved roads and working surfaces shafl be watered frequently to minimize dost. <br /> ........... <br />