Laserfiche WebLink
Rem No. 2 + <br /> PC: 12-16-93 <br /> ER-93-1 NP-93-4 <br /> Page 21 <br /> ATTACHMENT C <br /> MITIGATION MONITORING PROGRAM FOR THE <br /> TRACY MATERIALS RECOVER AND TRANSFER FACILITY <br /> (For Significant Impacts Only) <br /> Land Use and Planning Poli <br /> Mitigation Measure: If a bird hazard Is_idermfiecL the aonlicants will be regui <br /> red 10 rxovide <br /> mkation such as netting, a noise system_or other means to ward off bi as reouired by the <br /> &port Land Use Co <br /> Monitoring Requirement: Periodic insoectkwL <br /> R2Mq[ Agency RWDonsible_„_Airnon Land Uslgommission., <br /> Timing or F[eguencv of Monitoring: Qaggh,L <br /> V etation and Wildlife ResouLcM <br /> 01 <br /> Mitkiation Measure: IA4&hln 2 Not more than 60 days prior to construedon,the-appli <br /> stale a professional biologist retained by the aoolicant shall to conduct a preconstruction survey <br /> of the site for the presence of the San Joaquin kit fox. If any kit foxes are found, precautions <br /> specified in Chapter 4.2, Condition 4.2-4, of the Final EIR shall be taken. <br /> Monitoring Requirement: Review of survey results prior to construction. <br /> Pe A <br /> Aency Res nsible: San Joaquin County Community Development, California <br /> Department of Fish and Game (DFG), U.S.Fish and Wildlife Service. <br /> Timin or Fr uen of-Monitoring: Within 3A 60 days of construction. <br /> at r <br /> Mitigation Measure: <br /> Not more than 60 days Drior to construction a <br />