Laserfiche WebLink
Item No. 2 <br /> Pc: 12-16-93 <br /> ER-93-1/UP-93-4 <br /> ' Page 22 <br /> J <br /> �ai airy for the <br /> bmkwAMowis`If-present,els specified In Chapter 4.2,Con an 4.2-6. of the Final EIFL <br /> Mont dog Requirement: Review of survey results prior to construction. <br /> Persc l .gencvegeq ionsi : San Joaquin County Comnwnity Development Department, <br /> Depeftment of Irish and Game: <br /> Tmiina or Fre66ency of Monitoring: Within QO days of construction. <br /> Geoltm/Ceatechnical: <br /> Edogatfon Measure: Seismic design; shall be in accordance with the Uniform Building Code <br /> (Seismic Zone 4),as specified in the project geotechnica'report continued in Appendix F of the <br /> EIFL <br /> Monitoring ReaWement: Incorporate into bulld ng plans submitted for plan check prior <br /> to building pemnit issuance._ <br /> Parson/Age ncy Responsible: San Joaquin County Bu€tdmg Inspection Division. <br /> Timing or aeouency of Monitoring 'Prior to issuance of building permits. <br /> mom. M 0": AS new:cuts `'and fib sW .be consistent with the geotechnical <br /> recornmendadim contained In Appen dbc F or the Imo. In areas where slopes are steeper than <br /> 2:1 the tdkmdng mitigation measure shad be implemented: regrade slopes to 21 or flatter, or <br /> setback d improvements at least 30 feet from ttie top and bottom of slopes, or erect Landslide <br /> debris barriers. <br /> Montt nct_ Reguirernent; Incorporate into gra ng plans submitted for plan check prior <br /> to gratr'ehg permit issuari6e. <br /> Pew t , agWonsible. San Joaquin County Budding lnspection Division. <br /> Tirnino br Fre%ae M of Mon ort: Prior to issuance of grading permits. <br /> Motion Measure: Construction of fids, foundations, stabs and roadways on-site shall be in <br /> accordance with the geotechnical recommendations contained in Appendix F of the EIR. <br /> MonjjgM9 RecwireIncorporate into building and grading plans submitted for plan <br /> cheek prior to gfading permit issutite. <br /> PersoNApencv Resaonstble: San Joaquin County Budding Inspection Division. <br /> Timing or Freouencv of Monitoring: Prior to Issuance of grading and/or building permits. <br /> i <br />