Laserfiche WebLink
Y <br /> M <br /> Item No. 2 <br /> PC: 12-16-93 <br /> ,. ER-93-1/UP-93-4 <br /> Page 24 <br /> Ma116rirt .joeasure: AreascaDntaining equipment shall-be curbed to contain petroleum product <br /> and hydraulic fluid Isaks. Truck washing areas shall be equipped with trench drains to collect <br /> waste water. <br /> Mordtorim BM Show on improvement Plant. <br /> PersorifAaencv Resoonsib&: San Joaquin Gourley Community Development Department. <br /> Timing or Eoamm of Monitorkg: Improvement Plan. <br /> Mgog2M M rs. Personnel working with the"load sc reenting program' and on the 'tipping <br /> floW shall have 40 hours.of OSHA training on snip int, personal protective equipment, <br /> and the handling of recyclable household hazardous materials. <br /> Monitoring Requirement: Slow on Improvement Plan <br /> Person/AoencvRes o�nsit Sart Joaquin County Public Health Services and Cal OSHA <br /> Timing or Frequency of MoriifW_M: Prior to operations. <br /> Monitoring Measure: Art approved hazardous material storage area(s)-shah be provided at the <br /> facility for storage of hazardous wastes discovered as a result of load screening and processing. <br /> Monitoring Aegulrement: Show on Improvement Plan. <br /> P R : San Joaquin County Public Health Services, San Joaquin <br /> County Community Development Department.. <br /> ThM or FMgIgM of Rxiltorirua: Improvement Plant. <br /> MonkgMg Measure: Unpaved roads and working surfaces shall be watered frequently to <br /> miriirmize dust <br /> Monitoring Reguiremerit: Regular sprinkling of roads and working surfaces during <br /> construction. <br /> PersoO Agency Responsible: San Joaquin Valley Unified Air Pollution Control District. <br /> Timing or Frequency of Monitoring: Throughout construction phase. <br /> Monftorirg Measure: 'Berms or other measuresshall be utilized to prevent a i 00-year 24 hour <br /> flood in Corral Hollow Creek from accidently overflowing into the plc An acceptable alternative <br /> to the constmoJon of berms would be that the protect avolicant provide an analysis of Corral <br /> Hollow Creek for the 100-year/24-hour storm event to determine the likelihood of overtopping and <br /> diverting nto the 21L Should overt to ta a lik event the Proiect apphoam would <br /> l J then be required to s omit to the reviewing agency an engineered plan for prevention of said <br /> T <br /> ovaq222Lng. Acceptable mitt ations; would include the construction of berms or levees or the <br />