Laserfiche WebLink
Item No, 2 <br /> PC: 12-16.93 <br /> ER-93-9/UP-93-4 <br /> Page 25 <br /> Widening and deepening of the channeladjacent to the project site <br /> :. <br /> ltorfrtg Reou€rement: Show on improvement Plain. ' <br /> PersonlAgencv Resflonsble: San Joaquin County C4mmurjlty 09paMrAM Department <br /> of Public Works Flood Control Division, <br /> _Timing or Freguencv of,Monitoring Improvement Plan. <br /> VISUA AESTHETICS <br /> MOnkoft Measure: Litter shall be picked up regularly from the project site, surrounding <br /> Properties and along the approach to the site, <br /> Monitoring R„ u€rement: Daily litter patrols shall coiled project related litter. <br /> Person ftency. Res ble: Applicant. <br /> Timing or Freouencv of Monitoring: Throughout ft Ile of the project. <br /> AIR QUALITY _ <br /> -Monitoring Measure:. Preparation of a PM10 Dust Prevention and Control Plan that includes the <br /> dust control measures specified in Chapter 4.7, Condition 4.7-1. <br /> Monkoriog Requirement: Submit copy of plan, <br /> PM208g2M Res sible: San Joaquin Valley Unified Air Pollution Control District. <br /> TIMIM or Frecluencv of Monkorin : Prior to Issuance of building or grading permits. <br /> Monitoring Measure: Daily wasia-do cleaning of the Upping floor and periodic steam cleaning <br /> of the transfer trailers. <br /> Monitoring Reoyirement: Daily, and as needed to control odor. <br /> Person Agency Responsible: Applicant <br /> Timing or FLeguency of Monitoring Throughout the life of the project. <br />