Laserfiche WebLink
COPY <br /> GENERAL CONSIDERATIONS: <br /> L. Does it appear that any environmental feature of the project <br /> will generate significant public concern or controversy? <br /> ( ) Yes (X) No Nature of corlCeM(s) <br /> 2- will the project require approval or permits by agencies other <br /> than the County? (K) Yes ( ) No <br /> Agency name(s) : UA-54.— %. ,l <br /> 3 : Is the project within the Sphere of Influence, or within two <br /> miles, of any city? <br /> { ) Yes (X) No city: , . <br /> ENVIRONMENTAL IMPACTS: <br /> "Yes' may only be checked in situations where the:~e is substantial evidence to <br /> indicate that .there may be a significant adverse impact an the environment if <br /> there is no change in the project dere iption. (C-l"QA Guidelines, Sec. 15064) <br /> See the -Discussion- section at the end of the Inst, l`Study for explanation of <br /> any impacts checked "Yes", or any "No" answer marked wily an asterisk {�} . <br /> sources. The following sources of information have been used in determining <br /> environmental impacts: <br /> original source materials and maps on file lm the Community Development <br /> Depar--ment including: all -Coant7 and City general plans and commLtnity plans; <br /> assessor parcel books, various local and FUX.flood sane maps; service dist=;c'_ <br /> maps; maps of geologic nzta Ulm; maps and reports on endangered species such <br /> as the Natural D_versity Data Base; noise contour maps; specific roadway plans; <br /> maps and/or records of archeological/historic ratsou=es; soil reports and maps; <br /> etc. Many of these original ; ince materials have been collec4ed from ot&e; <br /> public agencies or from previously prepLred EIR's and other technical studies. <br /> Additional standard sources which should be spec?fical,ly cited below include <br /> on-site visits by staff (nota date), staff knowledge or experience; and . <br /> i.-ideoendent env=4onmental studies submitted to the County as part of the project <br /> analicati.on (note report title, date, and consultant) . <br /> YES NO <br /> 1_ WA.'^ <br /> a-. is any per tion of the project <br /> subject to -flood hazard? _ <br /> Flood zone G� <br /> ;nitial Study (Rev:01-1 /91) <br /> 2 <br />