Laserfiche WebLink
C OPY <br /> XES <br /> b. Will the project result in go <br /> reduction of surface or ground <br /> water quality or quaztity? �( <br /> c. Will the project result in <br /> increases to surface, channel <br /> or 'stream volumes, or alterations <br /> to drainage patterns and streams? �( <br /> d. Will -the project result in <br /> erosion of or sedimentation to x <br /> a channel, river, or body of water? <br /> Other sources used: <br /> 2. EARTH: <br /> a. Will the 'project result in or be <br /> subject to potentially hazardous <br /> geologic or soils conditions on or <br /> immediataly. adjoining the site (slides, <br /> springs, erosion, liquefaction, <br /> earthjuake faults; steep slopes, <br /> septic tank limitations) ? <br /> b. Will the project involve substantial <br /> grading which could result in <br /> secondary impacts (consider amount, <br /> steepness, and visibility of proposed <br /> slopes; consider effect of grading on <br /> trees and creek channels) ? <br /> C. Will there be conversion of prime <br /> farmland (over 40 acres and not shown <br /> for development in the General Plan)? <br /> Other sources used: <br /> 3 . Plant Anima Lile: ' <br /> a. Will there be a reduction or <br /> disturbance to any habitat for <br /> plants and animals (including <br /> removal cr disturbance of t=ees, <br /> ripariRan areas, or migration routes) ? <br /> b. Will the project impact any rare, <br /> endangered, threatened, or recreational <br /> Initial Studv (Rev:01 9'!) <br /> 3 <br />