RECLAMATION PLAN—SOLARI PTI'2002 <br /> George Reed, Inc. <br /> Page 3 <br /> I. DESCRIPTION OF ENVIRONMENTAL SETTING continued <br /> C. H drolo <br /> The most recent incident of extreme precipitation and flooding along the Central Valley's rivers <br /> occurred in 1997. None of the parcels within or adjacent to the project area were inundated or <br /> subjected to overflow from the South bank of the Mokelumne River (with an existing elevation <br /> variance from 184' to t87')_ Recent discussions with the San Joaquin County Department of Public <br /> Works indicate the proposed project is outside the floodplain. During extreme precipitation and/or <br /> high river flows, normal flooding occurs along the North bank, with an existing elevation variance of <br /> 180' to 182'. As a precautionary measure to insure against any possible flooding of reclaimed <br /> orchards,the applicant proposes to construct a berm with a minimum top elevation of 86' on the river's <br /> 1 -1 sloe and will be positioned adjacent <br /> South bank. The berm will have a to width of 12 with a 2. slope, p J <br /> Sou p <br /> to the excavation perimeter outside the riparian tree drip line. Additionally, the berm will continue <br /> along the Western boundary line of the property with a uniform top elevation of 186', thus preventing <br /> any potential flooding, during excavation, attributable to adjacent low lands to the West. The soils <br /> stockpiled in the western boundary berm will be utilized for final reclamation of Phases 2 and 3. <br /> Construction of the berm will be completed concurrent with the excavation of the I" phase. Berm <br /> details are shown on the Reclamation Site Plan map. Excavation depths will not exceed 125',therefore <br /> penetration of groundwater situated at 1130' will not occur.(Ref: San Joaquin County Flood Control& <br /> Water Conservation District— Groundwater Report, Fall 1998). Waste discharge is not applicable to <br /> this application. <br /> D. Soil Assessment <br /> Engineered drawings, based on boring logs, indicate an abundance of topsoil to complete reclamation <br /> of disturbed areas back to farming capability. The quarry area is located entirely within Vina and <br /> Columbia soils. The U.S. Soil Conservation Service has stated that the Vina and Columbia soils are <br /> Prime Farmland. These soils are generally used for irrigated cropland, orchards and vineyards. They <br /> are well suited for irrigated row, field, orchard, and vine crops, and have few limitations. Permeability <br /> of the Vina soil is considered moderate, and Columbia soils are moderately rapid (2.0 — 6.0 in/hr). <br /> Runoff is considered slow and the hazard of water erosion is slight. Underlying these soils are sand, <br /> gravel, and rock to be excavated. Replacement of the "top soils" for reclamation has been successful <br /> as can be seen on the adjacent parcel, where 100(previously excavated)acres have been reclaimed to a <br /> walnut orchard. The operator has successfully reclaimed 250 acres of excavated land back to walnut <br /> and almond orchards with annual yields equal to, and sometimes exceeding, the County average in <br /> production. <br /> E. Vegetation/Wildlife <br /> All but 20 acres of open land(where excavation will commence) is currently walnut orchards and has <br /> been farmed for many years. The only vegetation and/ or wildlife of concern are located adjacent to <br /> the project area along the riparian corridor of the Mokelumne River, which will not be disturbed. <br /> Pursuant to Section 9-1510.5 of the San Joaquin County Development Title, excavation or other <br /> activity will be limited to a minimum of 100' from the mean high water level of the natural bank and <br /> 25' outside the drip line of any existing trees to provide a natural open area for the riparian habitat. . <br /> No trees will be harmed or removed. There are no rare, threatened, or endangered species of wildlife <br /> and/or plants identified within the project site (Reference EIR-90-8). Noxious weeds are non-existent <br /> due to the many years of farming within the project area. <br /> F. In-Stream Mining <br /> In-stream mining is not applicable to this project. <br />