My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010493
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
23813
>
2600 - Land Use Program
>
PA-0200182
>
SU0010493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 11:51:19 AM
Creation date
9/6/2019 9:57:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010493
PE
2656
FACILITY_NAME
PA-0200182
STREET_NUMBER
23813
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
APN
01922040
ENTERED_DATE
5/19/2015 12:00:00 AM
SITE_LOCATION
23813 N MACKVILLE RD
RECEIVED_DATE
3/7/2024 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\APPL.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\CDD OK.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development Title <br /> Section 9-1415.3[d]) <br /> g. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> otherwise modified by conditions of the Quarry Excavation Permit. (Development Title Section 9- <br /> 1415.3[e]) <br /> h. HOURS OF OPERATION: Plant operations shall normally be carried on during the hours from 5:00 <br /> a.m. to 9:00 p.m. (Development Title Section 9-1415.3[f]) <br /> i. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of an <br /> excavation, the topsoil shall be replaced and the site leveled in conformance with the excavation <br /> permit. (Development Title Section 9-1415.3[g]) <br /> j. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br /> instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br /> 9-1415.3[h]) <br /> k. HEALTH CONSIDERATIONS: This quarry excavation shall: <br /> (1) Not cause health or sanitary hazards and shall not create conditions which will cause the <br /> breeding or increase of mosquitoes, rodents, or other pests. <br /> (2) Provide an approved potable water supply for all employees. <br /> (3) Provide approved toilets for all employees (chemical toilets are acceptable). <br /> (4) Provide handwashing facilities on or near the approved toilets. (Development Title Section 9- <br /> 1415.3[1]) <br /> I. SETBACKS: No excavation shall take place within twenty-five (25) feet of any property line or right- <br /> of-way (nor within the allowed slopes adjacent to said twenty-five (25) foot setback), unless the <br /> elevation prior to excavation is more than that of the abutting property, in which case the elevation <br /> within said twenty-five (25)foot setback shall at no time be less than that of the abutting property, at <br /> the property line. (Development Title Section 9-1415.3[j]) <br /> m. SLOPES: The following provisions do not apply to temporary interior cut slopes (i.e., working slopes <br /> that do not fall within any of the criteria listed below). Temporary interior cut slopes shall comply with <br /> the Cal OSHA Code of Regulations and/or the Federal OSHA Code of Regulations, as applicable. <br /> (Development Title Section 9-1415.3[k]) <br /> (1) Terracing Required. All slopes over fifty (50) feet in height shall be terraced with a maximum <br /> vertical distance between terraces of fifty (50)feet. Each terrace or bench shall be a minimum of <br /> twelve (12) feet wide. <br /> (2) Terrace Drainage. Drainage plans with calculations shall be submitted for approval to the <br /> Development Services Division for all terraces as part of the Reclamation Plan. <br /> Terraces for reclaimed final slopes shall be sloped back towards the fill and be designed such <br /> that runoff is directed to collection points where it can enter catch basins and be conveyed via <br /> PA-0200182 (QX, RA) Revised Conditions of Approval 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.