Laserfiche WebLink
f. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br /> shall be required where necessary for the control of erosion. An erosion and sediment control plan <br /> approved by Development Services Division shall be part of the reclamation plan. (Development Title <br /> Section 9-1415.3[d]) <br /> g. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> otherwise modified by conditions of the Quarry Excavation Permit. (Development Title Section 9- <br /> 1415.3[e]) <br /> h. HOURS OF OPERATION: Plant operations shall normally be carried on during the hours from 5:00 <br /> a.m. to 9:00 p.m. (Development Title Section 9-1415.3[f]) <br /> i. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of an <br /> excavation, the topsoil shall be replaced and the site leveled in conformance with the excavation <br /> permit. (Development Title Section 9-1415.3[g]) <br /> j. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br /> instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br /> 9-1415.3[h]) <br /> k. HEALTH CONSIDERATIONS: This quarry excavation shall: <br /> (1) Not cause health or sanitary hazards and shall not create conditions which will cause the <br /> breeding or increase of mosquitoes, rodents, or other pests. <br /> (2) Provide an approved potable water supply for all employees. <br /> (3) Provide approved toilets for all employees (chemical toilets are acceptable). <br /> (4) Provide handwashing facilities on or near the approved toilets. (Development Title Section 9- <br /> 1415.3[1]) <br /> I. SETBACKS: No excavation shall take place within twenty-five (25) feet of any property line or right- <br /> of-way (nor within the allowed slopes adjacent to said twenty-five (25) foot setback), unless the <br /> elevation prior to excavation is more than that of the abutting property, in which case the elevation <br /> within said twenty-five (25)foot setback shall at no time be less than that of the abutting property, at <br /> the property line. (Development Title Section 9-1415.3[j]) <br /> m. SLOPES: The following provisions do not apply to temporary interior cut slopes (i.e., working slopes <br /> that do not fall within any of the criteria listed below). Temporary interior cut slopes shall comply with <br /> the Cal OSHA Code of Regulations and/or the Federal OSHA Code of Regulations, as applicable. <br /> (Development Title Section 9-1415.3[k]) <br /> (1) Terracing Required. All slopes over fifty (50) feet in height shall be terraced with a maximum <br /> vertical distance between terraces of fifty (50)feet. Each terrace or bench shall be a minimum of <br /> twelve (12) feet wide. <br /> (2) Terrace Drainage. Drainage plans with calculations shall be submitted for approval to the <br /> Development Services Division for all terraces as part of the Reclamation Plan. <br /> Terraces for reclaimed final slopes shall be sloped back towards the fill and be designed such <br /> that runoff is directed to collection points where it can enter catch basins and be conveyed via <br /> PA-0200182 (QX, RA) Revised Conditions of Approval 2 of 6 <br />