My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010493
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACKVILLE
>
23813
>
2600 - Land Use Program
>
PA-0200182
>
SU0010493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 11:51:19 AM
Creation date
9/6/2019 9:57:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010493
PE
2656
FACILITY_NAME
PA-0200182
STREET_NUMBER
23813
Direction
N
STREET_NAME
MACKVILLE
STREET_TYPE
RD
City
CLEMENTS
APN
01922040
ENTERED_DATE
5/19/2015 12:00:00 AM
SITE_LOCATION
23813 N MACKVILLE RD
RECEIVED_DATE
3/7/2024 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\APPL.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\CDD OK.PDF \MIGRATIONS\M\MACKVILLE\23813\PA-0200182\SU0010493\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN—Reed-Clements Pit 2015 <br /> George Reed, Inc. <br /> Page 4 <br /> processing facility. An aerial photo depicting the project site, haul road, and processing facility is <br /> attached. <br /> II. DESCRIPTION OF PROPOSED MINING OPERATION (continued) <br /> B. Estimated Production Schedule <br /> PRASE I: Product Completion Reclamation <br /> ±29 Acres 332,000 CY S/G 2010-2015 2017 <br /> 500,000 CY OB <br /> PHASE II: <br /> ±20 Acres 220,000 CY S/G 2015 -2017 2019 <br /> 330,000 CY OB <br /> PHASE III 446,000 CY S/G 2017-2021 2023 <br /> ±40 Acres 670,000 CY OB <br /> PROJECT TOTALS: 1,000,000 CY S/G <br /> 1,500,000 CY OB <br /> NOTE. Annual Average Mining Quantities- 10 Acres/Year <br /> 166,667 CY Overburden/Year <br /> 111,333 CY Sand& Gravel/Year <br /> C. Minine-Plan <br /> 1. Operating Plan <br /> Excavation will commence within 18 months after obtaining a permit and will terminate with total <br /> reclamation within 11 years, dependent upon demand for materials. Excavation occurs approximately <br /> 180 days in a year. Weather conditions and market factors can alter this approximation. Excavation <br /> activity typically occurs between March—October each year. Excavation will be limited to a weekly <br /> schedule of Monday—Friday, 6:00 a.m. to 6:00 p.m., except during periods of declared national, state, <br /> or county emergency or inclement weather. <br /> 2,3. Topsoil/Overburden <br /> Topsoil / Overburden is stripped, set aside temporarily, then replaced concurrent with excavation.. <br /> Excavation is by the open pit method commencing at the Southern end of Phase 1, moving in a <br /> Northerly direction,. Excavation depths average ±25'. Overburden ranges in depth from 0' to f15', <br /> with sand and gravel depths averaging from t7' to f10'. <br /> Equipment to be used at the project site consists of: <br /> ■ Scrapers/Dozers to remove overburden <br /> ■ Backhoe/Excavator to remove sand and gravel <br /> ■ Trucks to transport materials to the existing processing facility on the North side of the <br /> Mokelumne River. <br /> ■ Motor Grader and Scraper to level and contour site for final reclamation <br /> ■ Water Truck to spread water within project area for dust control <br />
The URL can be used to link to this page
Your browser does not support the video tag.