Laserfiche WebLink
Kent'Sullivan -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-04-248(ZR) <br /> 3. Public storm drainage service shall be required and shall discharge into Morman Slough for terminal <br /> drainage. All easements,right-of ways or property necessary for the Public Storm Drainage System shall <br /> be provided by the applicant at the time of subdivision development. <br /> 4. A State National Pollution Discharge Elimination System(NPDES) Construction Permit Notice of Intent <br /> (NOI) shall be filed with the State Water Resources Control Board if over one (1) acre of total ground is <br /> disturbed. <br /> NOTE: Access to City of Stockton sewer service may require annexation into the city limits. If the project is <br /> annexed,the City of Stockton shall provide public storm drainage. <br /> A traffic impact study will be required to determine any mitigations required to offset traffic related <br /> impacts. <br /> DTP:DG:ar <br /> P\COhII.ffiNiSVRTM0a00368.wpd <br />