Laserfiche WebLink
Chandler Martin -4- <br /> COMMENTS ON DEVELOPMENTS <br /> PA-04-789(SU)and PA-04-248•(ZR) <br /> 19. Offer of Dedication of ground water rights on the Final Map is required. <br /> 20. This development is subject to reapportionment under the San Joaquin Area Flood Control Agency <br /> Assessment District No. 96-1 (Flood Protection Restoration Project). An application requesting the <br /> reapportionment of the unpaid portion of the assessment, along with payment of the reapportionment fee, <br /> shall be provided prior to approval of recording the Final Map. <br /> 21. Annexation of the development into CSA 41 for storm drainage and street lighting shall be required. <br /> Applicant shall pay all required fees to process annexation prior to approval of recording the Final Map. <br /> -22. The Vi operty shail transfe, to a zon. within E3outny Ser rice�, ea. F.iot to recording tire Fitral Map to <br /> the�e shall be approved by the property umneto ptim to mcording the Final Map. The aSSCSSI.—Ift f6l tile <br /> new =ic shall be based on the cost for. m2tintetranm, oper.tion, system improvements, and any replacement <br /> vzograrn of ftciiities Yvithir, eS,k 4h Tile applicant-112H MY f0t tbC�c`St to Frocca� the transfer it, <br /> systelu fru...the tinte the fiteilities we accepted by the E)iztrict until tile trmtskned aren is placed o <br /> 9MMSSITIcut I Ole Of tire Distt ict. (Development Title Section 9-1100.5) <br /> 23. Therp opo erty shall transfer to a zone within CSA 41 prior to approval of the Final Map to provide for the <br /> operation, maintenance and improvement of storm drainage facilities and street lighting facilities. The <br /> applicant shall petition the County for the needed services and pay the applicable fee. Upon approval by the <br /> Board of Supervisors for provision of the services the development will receive services conditional upon <br /> completion of all necessary facilities The petition process shall be completed prior to approval of the Final <br /> Map In addition the applicant shall pay for the maintenance and operation of the system from the time the <br /> facilities are accepted by the District until the transferred area is placed on the assessment role of the <br /> District. (Development Title Section 9-1100.5) <br /> 24. A State National Pollutant Discharge Elimination System(NPDES)Construction Permit Notice of Intent <br /> (NOI)shall be filed with the State Water Resources Control Board if over one(1)acre of total ground is <br /> disturbed. A Storm Water Pollution Prevention Plan (SWPPP) shall also be submitted to the County of San <br /> Joaquin Stormwater Division for approval. <br /> 25. Applicant shall submit a plan to the County of San Joaquin Stormwater Division that addresses the on-site <br /> retention, infiltration, or treatment of the 85%runoff, as per the County's Stormwater Quality Control <br /> Criteria Plan. <br /> 26. The tentative SubdivisionNtap shallexpi=36trionthsafte, thedate of its appiuval, The applicant nifty <br /> apply Fol 3 tilM extension. (Bi visiun Title Section 9-857.5) <br /> 27. The applicant/develoMr shall pay their"fair share"for the cost of signalizing Main Street and State <br /> Highway Route 99 northbound off-ramp intersection The fair share amount is $10,000. <br /> 28. The applicant/develover shall be reouired to place if not already existing a traffic signal at the intersection <br /> of Main Street and Wagner Avenue. <br />