Laserfiche WebLink
k. Dedication to result in a 42-foot-wide right-of-way from the centerline of Main Street to the <br /> property line shall be required on the Final Map and improved on the subdivided side to County <br /> Standards for a 50-foot-wide right-of-way local residential street. (Development Title Section 9- <br /> 1150.5[b]) <br /> I. Dedication to result in a 42-foot-wide right-of-way from the centerline of Main Street to the <br /> property line shall be required on the Final Map and improved on the subdivided side to County <br /> Standards for an 84-foot-wide right-of-way minor arterial street. (Development Title Section 9- <br /> 1150.5[b]) <br /> m. A terminal drainage system shall be provided to meet the requirements of the County and to <br /> provide adequate drainage for the subdivision. Hydrologic and hydraulic analyses shall be <br /> provided and demonstrate that all property, both downstream and upstream of the discharge, will <br /> not be subject to a higher flood level as a result of the proposed drainage. Service shall be <br /> provided by CSA 41. (Development Title Section 9-1135.2) <br /> n. The project shall be served by a public water system conforming to the requirements of <br /> Environmental Health and Public Works. The system shall provide adequate domestic and fire <br /> water supply in conformance to the requirements of the County Fire Warden and the local fire <br /> district. Service shall be provided by Cal Water. (Development Title Section 9-1120.2) <br /> o. The project shall be served by a public sewer collection and treatment system constructed in <br /> conformance with the requirements of Environmental Health and Public Works. Service shall be <br /> provided by the City of Stockton. (Development Title Section 9-1105.2) <br /> p. The County has reviewed the will-serve letter obtained from the City of Stockton for sanitary <br /> sewer service for this development application. The letter states that capacity within the system <br /> is not reserved at this time, and the letter expires in two years. Therefore, it is the applicant's <br /> responsibility to ensure that a current will-serve letter is on file prior to approval of the Final Map <br /> by the County Surveyor. The applicant or the subsequent owner of the property will be <br /> responsible to ensure that there is capacity in the system at the time of issuance of building <br /> permits. <br /> q. Street lighting shall be provided for the subdivision and the frontage of Main Street, Horner <br /> Avenue, and DelMar Avenue at the intersections of Main Street and DelMar Avenue, Delmar <br /> Avenue and La Spezia Way, Horner Avenue and Del Mar Avenue, and Liguria Way and Del Mar <br /> Avenue. (Development Title Section 9-1150.11) <br /> r. Annexation of the development into CSA 41 for storm drainage and street lighting shall be <br /> completed prior to approval of the improvement plans. The applicant shall pay all required fees to <br /> process the annexation. <br /> s. The property shall transfer to a zone within CSA 41 prior to approval of the Improvement Plans to <br /> provide for the operation, maintenance, and improvement of street lighting facilities and storm <br /> drainage. A new assessment for the zone shall be approved by the property owners prior to <br /> approval of the Improvement Plans. The assessment for the new zone shall be based on the <br /> cost for maintenance, operation, system improvements, and any replacement program of facilities <br /> within CSA 41. The applicant shall pay for the cost to process the transfer and assessment for <br /> the new zone. In addition, the applicant shall pay for the maintenance and operation of the <br /> system from the time the facilities are accepted by the District until the transferred area is placed <br /> on the assessment role of the District. (Development Title Section 9-1100.5) <br /> Conditions of Approval -3 - PA-0500469 <br />