Laserfiche WebLink
t. The subdivider shall agree to and shall pay user fees for the utility services from the time <br /> improvements are accepted by the County until the lots are placed on the County tax rolls, or up <br /> to an 18-month period, as the case may be. (Subdivision Map Act Section 66493) <br /> u. Access rights shall be dedicated and restricted for Lots 31, 46, 47, 75, 76, and 78 through 83 <br /> along the frontage of Main Street on the Final Map. (Development Title Section 9-1150.5) <br /> v. An Offer of Dedication of ground water rights on the Final Map is required. <br /> w. This development is subject to reapportionment under the San Joaquin Area Flood Control <br /> Agency Assessment District No. 96-1 (Flood Protection Project). An application requesting the <br /> reapportionment of the unpaid portion of the assessment, along with payment of the <br /> reapportionment fee, shall be provided prior to approval of the Final Map. <br /> x. The applicant/developer shall a fair share for the installation of a traffic signal at the intersection <br /> of Main Street and State Route 99 northbound off-ramp prior to approval of the Final Map. The <br /> fair share amounts to $29,500.00. <br /> y. The applicant/developer shall pay a fair share for the widening of Del Mar Avenue at the <br /> intersection of Main Street prior to approval of the Final Map. The fair share amounts to <br /> $9,593.00. <br /> z. The applicant/developer shall dedicate adequate right-of-way to provide for one left-turn and one <br /> right-turn lane on Del Mar Avenue and shall be shown on the Final Map. <br /> aa. As required by the City of Stockton, the owners, developers, and/or successors-in-interest shall <br /> participate in the East Main Sewer System #6 Area of Benefit. <br /> bb. The applicant/developer shall submit a Notice of Intent to comply with the State's construction <br /> general permit to the State Water Resources Control Board, develop a project Storm Water <br /> Prevention Pollution Plan, and design permanent water quality measures in accordance with the <br /> County's Storm Water Quality Control Criteria Plan prior to any construction. <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall require a <br /> State NPDES construction permit. <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT(Staff Contact: Amanda Boertien, 468-0623) <br /> a. Environmental Health requires connection to an approved public water supply system <br /> (Development Title Section 9-1120.2). In addition, a letter from the water supplier will be required <br /> which states that they have the capacity to serve the development and that the system meets <br /> State standards prior to recording the final map (Development Title Section 9-1100.3) <br /> b. Written confirmation is required from Public Works that improvements have been constructed or <br /> financial arrangements have been made for any improvements for public sewer required by the <br /> agency. In addition, written confirmation from Public Works that the agency has or will have the <br /> sewer capacity to serve the development is also required. (Development Title Section 9-1100.3) <br /> c. Environmental Health requires the applicant to open, pump, and backfill the septic tank, seepage <br /> pit, or excavation under permit and inspection by Environmental Health. (Development Title <br /> Sections 9-1110.3 and 9-1110.4) <br /> Conditions of Approval - 4 - PA-0500469 <br />