Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS TO DEVELOPMENT <br /> SA-01-17 <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $769.00 per <br /> 1,000 gross square foot of building designated as Warehouse in the Lathrop area. The fee <br /> shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record.) A credit may be allowed if it can be <br /> verified that the existing development on this site was in operation on or after April 23, 1990. <br /> (Resolution R-00-433) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development <br /> has addressed the items on the attached Waste Plan Format for Development Projects. Final <br /> Site Plan is required upon submittal of verification. <br /> GK:BN:mr <br /> Ps-ici% IB <br />