Laserfiche WebLink
c ulp � <br /> COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810- 1810 E. HAZELTON AVENUE <br /> •�'4(!eo"n"°• STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> Co APR 3 p 20p1 <br /> April 30, 2001 mmUnily peVelOftent pept <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Jennifer Jolley <br /> FROM: G k-Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-25 (REVISED) A SITE APPROVAL APPLICATION TO ESTABLISH A <br /> GUNITE STORAGE FACILITY TO BE COMPLETED IN TWO (2) PHASES. <br /> PHASE ONE WILL INCLUDE CONSTRUCTING A 3,200 SQUARE-FOOT <br /> POLE BARN TO STORE A CEMENT SILE, EQUIPMENT, AND TRUCKS <br /> USED FOR PARKING. PHASE TWO PROPOSES TO CONSTRUCT A <br /> 3,200 SQUARE-FOOT SHOP TO BE STARTED BY THE SUMMER OF 2002, <br /> LOCATED ON THE WEST SIDE OF MARIPOSA ROAD, 650 FEET SOUTH <br /> OF MUNFORD AVENUE. (DISTRICT 4). <br /> APPLICANT: Lloyd Haworth APN: 179-082-52 <br /> INFORMATION: <br /> A portion of the site is currently located within a Federal Flood Insurance Administration <br /> Designated Flood Hazard Area. The 100 year Flood Elevation is undetermined. In addition, <br /> the existing San Joaquin County and City of Stockton Flood Insurance Studies, which delineate <br /> flood risks, floodplains and floodway areas, are currently being reevaluated. The reevaluation <br /> is being conducted by the Federal Emergency Management Agency, Region IX, Building 105, <br /> Presidio of San Francisco, California 94129-1250, telephone (415) 923-7186. The reevaluation <br /> may delineate additional flood risks. The official flood maps are available for review at the <br /> Department of Public Works, 1810 East Hazelton Avenue, Stockton. These flood maps will be <br /> updated when the reevaluation process is completed. <br /> Mariposa Road has an existing right-of-way width of 80 feet and a planned right-of-way width <br /> of 84 feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br />