Laserfiche WebLink
JUI J5 2UUb 2 49PM CAA DEPAHIMENI Ol INANSPORIAIION No 398b P 3 <br /> Ms. Allen <br /> July 15, 2005 <br /> Page 2 <br /> • If a TTS is determined to be necessary, the Department recommends that San Joaquin <br /> County encourage the developer to submit a scope of work for conducting the TIS <br /> prior to circulating the local development applications for comtnent in order to <br /> expedite the Department's review This will insure that the TIS submitted follows the <br /> Department's guidelines as stated in the Caltrans Guide for the Preparation of'TrafJic <br /> Impact Studies, dated December 2002 (TIS guide). The TIS guide is available online <br /> at the following web address. httpJ/www.dot.ca.gov/hq/tpp/planning_tixmis/tools..htm <br /> • The Department supports the concept of"Fair Share Contributions" for future <br /> highway projects that may be required to maintain the existing level of service along <br /> State facilities, <br /> If you have any questions or would like to discuss our comments in more detail,please <br /> contact Dan Brewer at (209) 948-7142 (e-mail: dan.brewerndot.ca.gov) or me at (209) <br /> 941-1921. <br /> Sincerely, <br /> T DUMAS, Chief <br /> Office of Intermodal Planning <br /> "faRran,impraw.r nnhilin aonax California" <br />