Laserfiche WebLink
APPLICATION - AGRICULTURAL EXCAVATION , <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> D. Size: Provide the following information: - - <br /> IX] 1. Total acreage permitted or to be permitted. <br /> IX] 2. Total acreage to be disturbed. <br /> IN 3. Total acreage to be reclaimed. <br /> E. Water Requirements: <br /> IX] 1. Estimate of daily and annual water requirements. <br /> IX] 2. Identify the sources and uses of water. <br /> F. Contaminants: <br /> IX] 1. Identify potential contaminants and describe how they will be controlled or disposed. <br /> ( ] 2. Describe how imported wastes such as domestic garbage,chemicals,oil,or other materials will be disposed of. <br /> G. Waste Water: Discuss: <br /> IX] 1. How wastewater will tie contained or disposed of. <br /> H. Ore Processing: <br /> IX] 1. Describe the proposec method and equipment for processing ore(e.g., dry screening,flotation,leaching,etc.). <br /> IX1 2. Estimate minimum and maximum capacity(input and output)of the mill1processing facility. <br /> IX] 3. Provide the estimated life of the processing operation(if different from mine life). <br /> I ] I. Other Information: Include any other information requested by the lead agency to assess the environmental impacts of <br /> the proposed operation. <br /> III. DESCRIPTION OF PROPOSED RECLAMATION <br /> A. Subsequent Use(s): <br /> IX] 1. What is the proposed subsequent use for the reclaimed mined land(e.g., recreation,wildlife habitat,grazing,open <br /> space, etc.)? <br /> IX] 2. Evidence that owner(s)of a possessory interest(including surface rights)have been notified of the proposed use or <br /> potential uses after reclamation. <br /> B. Reclamation Schedule: <br /> IX] 1. Provide a time schedule that will ensure reclamation at the earliest possible time on those portions of the mined <br /> lands that will not be subject to further disturbance. <br /> IX] 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br /> each phase. <br /> IX] 3. If reclamation will not be concurrent with mining, explain why. <br /> F\DEVSVCIPIanning Application Forrnsl Page 10 of 13 <br /> Agrecuftural Excavatlon.doc.(Revised 8-10-05) <br />