Laserfiche WebLink
ARS N <br /> APPLICAMN - AGRICULTURKL EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: PA- <br /> B Reclamation Schedule: <br /> [X] 1. Provide a time schedule that will ensure reclamation at the earliest possible time on those portions of the mined <br /> lands that will not be subject to further disturbance. <br /> [X) 2. Provide a map of the proposed phases of reclamation and the corresponding acreage and dates for completion of <br /> each phase. <br /> [X1 3. If reclamation will not be concurrent with mining,explain why. <br /> C. Post Mining Topography: <br /> [X1 1. Provide a map of proposed post-reclamation topography; show drainage plan, benches, roads,plantings, and other <br /> pertinent features of the reclamation. <br /> [X) 2. Attach cross sections through slopes,cuts,and fills;show original ground, post-mining surface, underlying geologic <br /> conditions, and reclaimed surface. <br /> [X) 3. Describe how slopes will be stabilized to prevent failures/landslides,earth flows,falling rock, and erosion. <br /> [ ) 4. Specify slope design calculations including the factor of safety. <br /> [ ] D. Impoundments: Describe how impoundments will be reclaimed (e.g., regraded, dewatered,capped, revegetated, <br /> removed,etc.). <br /> [X) E. Drainage: Describe provisions for natural drainage and how erosion of disturbed land and sedimentation will be <br /> controlled during excavation and after final reclamation (e.g., revegetation,rip rap,sedimentation basins, berms,ditches, <br /> water bars, silt screens regrading,etc.). <br /> (X) F. Disposition of Old Equipment: Discuss the disposition of equipment, buildings,structures,etc. <br /> G. Revegetation: <br /> (X1 1. Explain topsoil (or soil substitute)redistribution methods, including volumes of materials to be redistributed, <br /> equipment and methods for transport, methods for preventing over compaction, and schedule for replacement. The <br /> explanation may include: <br /> [ ] a. The average thickness of replaced topsoil on the mine site. <br /> [ 1 b. Tests that will be run to determine whether soil or mine wastes need soil amendments to promote the support <br /> plant growth. <br /> [ ] c. Methods to be used to protect redistributed topsoil(or soil substitute)from wind and water erosion before and <br /> after seeding and planting. <br /> [ i 2. Explain the types and amounts of fertilizers, mulch, soil stabilizers,time,or other materials that will be used in <br /> revegetation and indicate when they will be applied. <br /> [ ] 3. Provide a planting plan. The plan may include: <br /> L <br /> a. How the site will be prepared for planting (e.g., ripping,disking,and incorporation of soil additives). <br /> b. A list of the species(include scientific names)to be planted. <br /> c. The type of plant material to be used (e.g., seeds, cuttings,container,plugs). <br /> F\DEVSVCWIanning Application Fonns\ Page 11 of 13 <br /> Agrecultural Exravation.doc.(Revised 8-10-05) <br />