Laserfiche WebLink
I. AESTHETICS: The surrounding area is a mixture of large and small <br /> ranches with little or no housing on these properties. The area to be <br /> reclaimed will blend in and join the surrounding area unnoticed. <br /> H. DESCRIPTION OF PROPOSED MINNING OPERATION: <br /> A. See Map <br /> B. PRODUCTION SCHEDULE: Removal of sand deposit to take two <br /> years with a annual removal of 50,000 cubic yards. <br /> C. MINING PLAN: <br /> 1. The removal of the sand will be on a year round basis except for <br /> poor or bad winter conditions with the majority of the sand <br /> being removed during the spring to winter_perio4 IfVpermit is <br /> approveA4ay 1, 2008,total reclamation should be completed by <br /> May 1, 2010 or sooner. <br /> 2. TOPSOIL: <br /> 1. The topsoil to be replaced over the excavated area from the <br /> northend of field (17 acres) will be removed and placed by <br /> self loading land leveling type scrapers. <br /> 2. There will be no stockpiling of the topsoil. The top soil will <br /> remain in place so that top soil area can be farmed and remain <br /> in crop production. <br /> 3. There will be no stockpiling of topsoil as stated in item #2. <br /> 3. OVERBURDEN/WASTE/ORE: <br /> A. The operation is a open pit type mine. <br /> Page two <br />