Laserfiche WebLink
G. WASTE WATER: There will be no waste water for this project. <br /> H. ORE PROCESSING; <br /> 1. There will be no ore processing for this project unless some dry <br /> screening is done to separate and retain more fine dirt that could <br /> used for farming. If so it would be a small portable screen. <br /> 2. At this time we are not contemplating any screening being done. <br /> 3. If any screening to be done as mentioned above it would only be for <br /> a time period of four or five months. <br /> 111. DISCRIPTION OF PROPOSED RECLAMATION: <br /> A. Subsequent Use: <br /> 1. The proposed use for this project is agriculture. The planting of row <br /> Crops. <br /> 2. Please see the legal owners signature on the permit application. <br /> B. Reclamation Schedule: <br /> 1. Upon the removal of all sand, the topsoil that was left in field for <br /> continual crop production will be placed into the excavation all at <br /> the same time and all reclamation will be completed. Once sand <br /> has been all removed it will take two land leveling scrapers two <br /> weeks to place topsoil and level to final approved grade. <br /> 2. See Maps. <br /> 3. By doing the reclamation this way only 12 acres will be distrubed <br /> and crop production will be year round.. <br /> page four <br />