My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007121
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MCDONALD
>
10450
>
2600 - Land Use Program
>
PA-0800111
>
SU0007121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:54 AM
Creation date
9/6/2019 10:08:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007121
PE
2606
FACILITY_NAME
PA-0800111
STREET_NUMBER
10450
Direction
W
STREET_NAME
MCDONALD
STREET_TYPE
RD
City
STOCKTON
APN
13106001
ENTERED_DATE
4/9/2008 12:00:00 AM
SITE_LOCATION
10450 W MCDONALD RD
RECEIVED_DATE
4/8/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MCDONALD\10450\PA-0800111\SU0007121\APPL.PDF \MIGRATIONS\M\MCDONALD\10450\PA-0800111\SU0007121\CDD OK.PDF \MIGRATIONS\M\MCDONALD\10450\PA-0800111\SU0007121\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. WASTE WATER: There will be no waste water for this project. <br /> H. ORE PROCESSING; <br /> 1. There will be no ore processing for this project unless some dry <br /> screening is done to separate and retain more fine dirt that could <br /> used for farming. If so it would be a small portable screen. <br /> 2. At this time we are not contemplating any screening being done. <br /> 3. If any screening to be done as mentioned above it would only be for <br /> a time period of four or five months. <br /> 111. DISCRIPTION OF PROPOSED RECLAMATION: <br /> A. Subsequent Use: <br /> 1. The proposed use for this project is agriculture. The planting of row <br /> Crops. <br /> 2. Please see the legal owners signature on the permit application. <br /> B. Reclamation Schedule: <br /> 1. Upon the removal of all sand, the topsoil that was left in field for <br /> continual crop production will be placed into the excavation all at <br /> the same time and all reclamation will be completed. Once sand <br /> has been all removed it will take two land leveling scrapers two <br /> weeks to place topsoil and level to final approved grade. <br /> 2. See Maps. <br /> 3. By doing the reclamation this way only 12 acres will be distrubed <br /> and crop production will be year round.. <br /> page four <br />
The URL can be used to link to this page
Your browser does not support the video tag.