Laserfiche WebLink
Kerry Sullivan -2- _ <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-97 <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $1232.00 per 1,000 gross square foot of <br /> building designated as Service Commercial or$176.84 per additional daily trip-end generated in the <br /> Stockton area. The fee shall be automatically adjusted July I of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is $490.00 per 1,000 gross square <br /> foot of building designated as Service Commercial. The fee shall be automatically increased on January <br /> 1 of each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. No permanent structures shall be constructed within sixty(60) feet of the Union Pacific Railroad right-of- <br /> way. <br /> 8. Driveway to the parking area shall be shown on the plans. <br /> GK:BN:sh <br />