Laserfiche WebLink
`. <br /> Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-78 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is $168.96 per additional daily trip-end <br /> generated in the Escalon area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. Applicant shall obtain a Storm Water Pollution Prevention Plan(SWPPP)permit from the State Water <br /> Resources Control Board prior to beginning on any construction. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall <br /> require a State NPDES construction permit. <br /> Access for trucks, farm equipment, etc., shall not be off of Fallbrook Court. <br /> DTP:DG:ar <br /> P\COFA9.'NTsIM"20 TA-0 78.wpd <br />