Laserfiche WebLink
---------------- <br /> WASTEWATER FLOW DETERMINATION METHODS AVERAGE DAILY FLOW VOLUMES <br /> EHD SEWAGE STANDARDS DATA (gallons per day) <br /> 30 gals/Office Employees x 67 employees 2,010 gpd <br /> Does Not Account for Aqua Pools'Construction Office <br /> Toilet Fixture Counts for a Store=24 toilets x 150 gals/fixture 3,600 gpd <br /> Parking Stalls: 166 Stalls x 15 gals/Stall for Industrial Buildings 2,490 gpd <br /> Accounts for Employees and Customers of Both Commercial Center and <br /> Aqua Pools'Construction Office <br /> Historical Data: Comparable Data Does not Exist ------- <br /> Average of All Wastewater Flow Determination Methods 2,700 gpd <br /> The new wastewater disposal system for the Aqua Pool and Spa facility has been designed for 2,500 <br /> gpd since this is based upon the approximate average of all flow determination methods above, and is <br /> within the operational capacity of one EnviroServer ES25. <br /> Daily wastewater flows for the Aqua Pool facility will be determined by flowmeters to be installed on <br /> the pumps that discharge effluent to the disposal field. It will be the determination of EHD on how <br /> effluent volume through the meters is to be quantified. This may be by taking a meter reading on a <br /> daily basis, or over a specified period of time and dividing by the number of days between readings to <br /> arrive at an average gpd. Therefore, the flowmeters must be readily accessible for easy reading. <br /> Peaking factors for users on septic tanks vary with usage during the hour of the day, and day of the <br /> week. Peak hourly rates are associated with normal working hours. The ratio of the peak day to the <br /> average day can vary from 1.5 to>5, depending upon the usage. However, since the ADF cannot <br /> exceed 2,500 gpd, peaking factors are not as relevant, and the effluent pump will dose on demand. <br /> Filter Bed Area <br /> The filter bed area is typically calculated under Section 8.7 of the San Joaquin County Sewage <br /> Standards and EHD Document 42-01-004: Calculation Requirements for Commercial Septic Systems: <br /> Calculated Tank Capacity (CTC) = 1,125 gals+0.75 x 2,500 =3,000 gals <br /> 2,500 gallon EnviroServer+ 1 - 500 gallon lift station(or a 1,200 gallon septic tank=3,000 gals <br /> Lineal Feet of Leachline(LFLL) = 1,200 BTC +2,500 ADF x 0.225 SF = 833 LFLL <br /> Filter Bed Area= 833 x 3 =2,500 square feet. However,the filter bed area should also <br /> correspond with the percolation, and more particularly, the infiltration test results. As referenced <br /> above, the application rate correlated with the infiltration test results, is 0.757 gals/ftZ/day. Using <br /> the ADF of 2,500 gpd= 0.757 gals/ftZ/day= 3,305 sq ft filter bed. The filter bed is proposed to be <br /> 60 ft x 60 ft= 3,600 ft . <br /> �L�— Page -8- Chamey <br /> age -8- <br /> Chesney Carrsulting <br />