My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004233 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
10251
>
2600 - Land Use Program
>
SA-01-82
>
SU0004233 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:34 AM
Creation date
9/6/2019 10:14:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004233
PE
2632
FACILITY_NAME
SA-01-82
STREET_NUMBER
10251
Direction
E
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
APN
24320039
ENTERED_DATE
5/14/2004 12:00:00 AM
SITE_LOCATION
10251 E MOFFAT BLVD
RECEIVED_DATE
8/7/2003 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MOFFAT\10251\SA-01-82\SU0004233\SS STDY.PDF \MIGRATIONS\M\MOFFAT\10251\SA-01-82\SU0004233\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater Disposal System Parameters and Appurtenances: <br /> One Lift Station with a comminutor or sewage pump to transfer waste influent to EnviroServer <br /> (MicroSepTec Requirement) <br /> One EnviroServer ES25 -2,500 gpd capacity (EHD Requirement) <br /> Capability to install future additional ES 15 or ES25 Systems, if needed (EHD Requirement) <br /> Zabel Filtration from ES25 to filter bed(EHD Requirement) <br /> Duplex pump systems for EnviroServer ES25 (EHD Requirement) <br /> Flowmeter on effluent from ES25 tank to filter bed (EHD Requirement) <br /> Distal end clean-outs on each lateral (EHD Requirement) <br /> As-Builts of entire system after installation(EHD Requirement) <br /> Monitoring of effluent with monitoring ports or wells within, or on the perimeter of the filter bed <br /> area. Observation tubes: 4" PVC Tee at soil/effluent interface with 4" riser flush with the grass <br /> surface and a screw-type cap. (EHD Requirement) <br /> 1.5 inches of peat at soil/effluent interface(EHD Requirement) <br /> Filter Bed Area= 60 ft north/south and 60 ft east/west=3,600 sq. ft. <br /> Laterals: 6 laterals, 10 ft apart Sch. 40 PVC, 1.5" nominal diameter, 7/32" orifice directed at 12 <br /> o'clock with 3" PVC orifice shield Zabel P.N. PDS-ZOS-125/150, 5.0 ft orifice spacing, 50 ft <br /> long. Orifice Discharge Rate: 7/32" with 5'residual head= 1.26 gpm <br /> 50 ft- 5 ft= 10 orifices/lateral x 1.26 gpm/orifice= 12.6 gpm/lateral <br /> Manifold= 3" Sch. 40 PVC <br /> Network Discharge Rate (NDR)=6 laterals, 10 ft apart x 12.6 gpm/lateral = 76 gpm. <br /> Estimated Total Dynamic Head(TDH): <br /> System head= 1.3 x 5 ft distal head= 6.5 ft <br /> Elevation head=6 ft <br /> Head loss in transport line =1.0 <br /> TDH= 6.5 + 6 + 1.0 = 14 ft(excludes possible check valves) <br /> EF50 pump (duplex system) <br /> Dose Volume: <br /> 0.106 gals/ft x 50 ft x 6 laterals = 32 gals x 10 times lateral void volume= 320 gals <br /> manifold=6 gals +transport line=2 gals= <br /> 320+ 6+ 2= 328 gals/dose- 76 gpm= 5 min/dose <br /> 2,500 gpd_ 328 gals/dose= 8 doses/24 hr period <br /> C. Wastewater Disposal System Operation <br /> The effluent will be pumped through the EnviroServer ES25 tank for nitrification/denitrification <br /> cycles. The effluent will then be pumped from the ES25 to six laterals to be equally distributed <br /> over a 3,600 ft' filter bed area. <br /> Page -9- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.