Laserfiche WebLink
Messrs. Swanson and Brown - 2 - 1 March 2007 <br /> Industrial Stormwater Permit <br /> Depending on the Standard Industrial Classification (SIC) code of the final project, compliance <br /> with the NPDES General Permit No. CAS000001 for Discharges of Storm Water Associated <br /> With Industrial Activities may be required. The SIC codes of activities requiring coverage are <br /> listed in the General Permit. In order to obtain coverage by the General Permit, the proponent <br /> must submit an NO] to comply with the permit to the State Water Resources Control Board <br /> and an SWPPP must be prepared. The permitting requirement applies both at the excavation <br /> site and the processing facility. <br /> Water Quality Certification - Wetlands <br /> If a U.S. Army Corp of Engineers (ACOE) permit is required due to the disturbance of <br /> wetlands, then Water Quality Certification must be obtained from the Regional Board prior to <br /> initiation of project activities. Section 401 of the federal Clean Water Act requires that the <br /> project proponent for any project that impacts surface waters of the United States (such as <br /> streams and wetlands) must request a 401 Water Quality Certification from the Regional <br /> Board. Water Quality Certification must be obtained prior to initiation of project activities. The <br /> proponent must follow the ACOE 404(b)(1) Guidance to assure approval of their 401 Water <br /> Quality Certification application. The guidelines are as follows: <br /> 1. Avoidance (Is the project the least environmentally damaging practicable alternative?) <br /> 2. Minimization (Does the project minimize any adverse effects to the impacted wetlands?) <br /> 3. Mitigation (Does the project mitigate to assure a no net loss of functional values?) <br /> Section 404 Permit <br /> If the project will involve the discharge of dredged or fill material into navigable waters or <br /> wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the <br /> US Army Corps of Engineers. If a Section 404 permit is required by the Corps, the Board will <br /> review the permit application to ensure that discharge will not violate water quality standards. <br /> If the project requires surface water drainage realignment, the applicant is advised to contact <br /> the Department of Fish and Game for information on Streambed Alteration Permit <br /> requirements. If a Section 404 permit is required, the proponent must apply to the Regional <br /> Board for a Water Quality Certification under Section 401. <br /> Dewatering Permit <br /> The proponent may be required to file a Dewatering Permit covered under WDRs General <br /> Order for Dewatering and Other Low Threat Discharges to Surface Waters Permit, Order No. <br /> 5-00-175 (NPDES CAG995001). The following discharges may be covered by this permit <br /> provided they do not contain significant quantities of pollutants and are either (1) four months <br /> or less in duration, or (2) the average dry weather discharge does not exceed 0.25 million <br /> gallons per day (mgd): <br /> a. Well development water <br /> b. Construction dewatering <br /> c. Pump/well testing <br /> d. Pipeline/tank pressure testing <br /> e. Pipeline/tank flushing or dewatering <br /> W\Sui606mmnSan Jo qui"ro Sa"rau I Mar 07 da <br />