Laserfiche WebLink
MOUNTAIN HOUSE PROPOSED MACHADO TENTATIVE MAP 4.ENVIRONMENTAL CHECKLIST — <br /> 4.16 UTILITIES AND SERVICE <br /> Less Than <br /> Potential SPIIIEIR Significant <br /> Significant Requires Impact Due Ne,r New <br /> Impact Additional to Mitigation Additional Additional — <br /> Less Than Adequately Review:No Measures in Impact Not Mitigation <br /> Significant Addressed in Significant Project Addressed in Measures <br /> Issue or No Impact SPIIIEIR Impact Description SPIIIEIR Required <br /> 16. UTILITIES AND SERVICE — <br /> SYSTEMS. Would the project: <br /> a) Exceed wastewater treatment ■ ❑ F1 —I <br /> requirements of the applicable — <br /> Regional Water Quality Control <br /> Board? <br /> b) Require or result in the construction ■ ❑ ❑ ❑ - <br /> of new water or wastewater — — <br /> treatment facilities or expansion of <br /> existing facilities,the construction <br /> of which could cause significant <br /> environmental effects? -- <br /> c) Require or result in the construction ■ L1 -J <br /> of new storm water drainage <br /> facilities or expansion of existing _ <br /> facilities,the construction of which <br /> could cause significant <br /> environmental effects^ <br /> d) Have sufficient water supplies . ❑ ❑ ❑ ❑ J <br /> available to serve the project from <br /> existing entitlements and resources, <br /> or are new or expanded entitlements <br /> needed? — <br /> e) Result in a determination by the ■ ❑ 11 ❑ ❑ ❑ <br /> wastewater treatment provider <br /> which serves or may serve the <br /> project that it has adequate capacity <br /> to serve the project's projected <br /> demand in addition to the provider's <br /> existing commitments? <br /> t) Be served by a landfill with ■ ❑ ❑ ❑ ❑ ❑ <br /> sufficient permitted capacity to <br /> accommodate the project's solid <br /> waste disposal needs? <br /> g) Comply with federal, state,and local ■ ❑ ❑ ❑ ❑ ❑ <br /> statutes and regulations related to <br /> solid waste? <br /> SETTING <br /> The Mountain House Community Services District(MHCSD)provides water supply, <br /> wastewater disposal, and storm drainage for the Mountain House Community of which the _ <br /> proposed project is a part. Infrastructure for these utilities has been provided in the <br /> neighborhoods currently under construction. Water supply includes a raw water supply <br /> under contract with the Byron-Bethany Irrigation District,treatment, and distribution _ <br /> including booster pump stations,pipelines and storage tanks. The current capacity of the <br /> water treatment plant (WTP)is five million gallons per day(mgd). Expansion of the plant to <br /> its ultimate capacity of 20mgd should begin shortly. Wastewater disposal includes collection <br /> 4-84 <br />