Laserfiche WebLink
II. MOUNTAIN HOUSE COMMUNITY SERVICE DISTRICT (Staff Contact: <br />Gabriel Karam, 209-831-5609) <br />1. GENERAL: <br />A. All subdivision improvements including but not limited to subdivision improvement plans, <br />specifications and master utility plans shall be in conformance with Community <br />Approvals, including but not limited to the Improvement Standards and Specifications of <br />the Mountain House Community Services District (MHCSD), the Design Manual, Master <br />Plan, Specific Plan III, master utility plans, and other standards and plans adopted by <br />the MHCSD. These improvement plans and specifications must be approved by the <br />MHCSD prior to approval of each phased Final Map. The plan check fees shall be <br />made with the submittal of the improvement plans and the field inspection services costs <br />shall be made to the MHCSD prior to signing of the improvement plans. If the actual <br />costs exceed the estimated costs, the developer shall pay the balance within 30 days <br />upon receiving an Invoice from the MHCSD. <br />B. The developer shall comply with all requirements of State, Federal, SP III, SP III EIR, <br />including but not limited to County, State and Federal requirements relative to air quality, <br />storm water discharge, waste disposal and hazardous waste and the mitigation <br />measures contained in the EIR for the Tentative Map. <br />C. All onsite and offsite easements and dedications including Mountain House Parkway, <br />Grant Line Road and De Anza Boulevard rights-of-way and any public or private utility <br />easements shall be dedicated to the MHCSD or offer of dedication to the MHCSD, as <br />required by the MHCSD, shall be on the Final Map. Dedication of Mountain House <br />Parkway, Grant Line Road and De Anza Boulevard rights-of-way and other needed <br />public rights-of-way shall be in conformance with the Master Plan, SP III, the MHCSD <br />Design Manual and Standard Plans and Specifications and the adopted Public Land <br />Equity Program (PLEP). Any easements to be abandoned that belong to Byron Bethany <br />Irrigation District (BBID) shall not be abandoned without prior approval of BBID. Timing: <br />condition shall be met prior to approval of Final Map. <br />D. All services performed by the MHCSD on any development project will be paid by the <br />applicant at the full cost including overhead as determined by the MHCSD General <br />Manager. The General Manager may set an interim fee as a deposit and reconcile to <br />the final cost at least annually. <br />E. Except where provided otherwise in a Project Acquisition Agreement, prior to the <br />recording of any Final Map, all infrastructure facilities outside the boundary of the <br />Tentative Map (water, sewer, storm drainage, electric power, natural gas, telephone, <br />communications, etc.) necessary to serve Tract 3481 shall be in place and fully <br />operational. The MHCSD General Manager may defer the installation of a facility if it can <br />be demonstrated to the satisfaction of the MHCSD General Manager that it is not <br />required for the phase of Tract 3481 being developed. Any deferral will require the <br />developer to provide the MHCSD a bond insuring the eventual construction of the facility <br />F. All conditions on the "Will Serve" letter from the Mountain House Community Services <br />District shall be met prior to approval of Final Map. The MHCSD General Manager may <br />defer the installation of a facility if bonding is provided and it can be demonstrated to the <br />satisfaction of the MHCSD General Manager that it is not required for the phase of Tract <br />3481 being developed. <br />14 <br />