Laserfiche WebLink
MITIGATION MONITORING AND REPORTING PROGRAM <br /> INTRODUC 1ON <br /> In accordance with the California Environmental Quality Act (CEQA), San Joaquin County <br /> (County) and Gerry N. Kamilos, LLC (GNK, LLC), prepared an environmental impact report <br /> (EIR) that identifies adverse impacts related to the College Park at Mountain House Specific <br /> Plan III Project. The EIR also identifies mitigation measures that would reduce or eliminate <br /> these impacts. <br /> Section 21081.6 of the California Public Resources Code §15091(d) and 15097 of the State <br /> CEQA Guidelines require public agencies "to adopt a reporting and monitoring program for <br /> changes to the project which it has adopted or made a condition of project approval in order <br /> t to mitigate or avoid significant effects on the environment."A Mitigation Monitoring and <br /> Reporting Program (MMRP) is required for the College Park at Mountain House Specific Plan <br /> III Project because the EIR for the project identified potentially significant adverse impacts <br /> related to construction and implementation activities, and mitigation measures have been <br /> identified to mitigate those impacts. <br /> Adoption of the MMRP will occur along with approval of the proposed project. <br /> l PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> _1 This MMRP has been prepared to ensure that all required mitigation measures are <br /> implemented and completed according to schedule and maintained in a satisfactory manner <br /> during the construction of the project, as required. The MMRP may be modified by San <br /> Joaquin County during project implementation,as necessary,in response to changing <br /> conditions or other refinements.A table has been prepared to assist the responsible parties in <br /> implementing the MMRP. The table identifies individual mitigation measures, <br /> monitoring/mitigation timing, responsible person/agency for implementing the measure, <br /> monitoring and reporting procedure, and space to confirm implementation of the mitigation <br /> measures.The numbering of mitigation measures follows the numbering sequence found in <br /> the EIR. <br /> IROLES AND RESPONSIBILITIES <br /> Unless otherwise specified herein, San Joaquin County is responsible for taking all actions <br /> necessary to implement the mitigation measures according to the specifications provided for <br /> each measure and for demonstrating that the action has been successfully completed..San <br /> Joaquin County, at its discretion, may delegate implementation responsibility or portions <br /> thereof to the developer (GNK, LLC), a licensed contractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for <br /> verifying that County staff members, and/or the construction contractor has completed the <br /> necessary actions for each measure. San Joaquin County will designate a project manager to <br /> College Park at Mountain House Spedfic Plan III EDAW <br /> 1 Son Joaquin County I Mitigation Monitoring and Reporting Program <br />