Laserfiche WebLink
� a <br /> e f <br /> -o' College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> e <br /> Mitigation Measure Timing/Schedule Implementation Implementation 8 Verification <br /> v; Responsibility Action Date Completed <br /> 0 <br /> Acontact the San Joaquin County Community <br /> c Development Department(SJCCDD) <br /> immediately, and a qualified professional <br /> :F archaeologist acceptable to County staff shall be <br /> notified and retained by the College Park <br /> 3 developer.The archaeologist shall determine <br /> whether the resource represents a"unique <br /> archaeological resource" or "historic resource" <br /> as defined by CEQA, and shall identify <br /> appropriate mitigation. The mitigation could <br /> potentially include, but would not necessarily be <br /> o limited to, avoidance, <br /> preservation in place with capping, photo <br /> documentation, and/or excavation/curation. <br /> In compliance with CEQA, Public Resources <br /> Code Section 5024.5, and the Caltrans <br /> Environmental Handbook, Vol. 1, should <br /> ground-disturbing activities within Caltrans <br /> ROWS take place as part of this project and <br /> there is an inadvertent archaeological or burial <br /> F <br /> discovery, all construction within 35 feet of the <br /> ofind shall cease and the Caltrans Cultural <br /> 'o— Resource Study Officer (CRSO), District 4, shall <br /> = be contacted immediately. A staff archaeologist <br /> �d will evaluate the finds within one business day of <br /> being contacted. The CRSO can be contacted at <br /> �• 510-286-2613 or 510-286-5618. <br /> A. <br /> 0 0 <br /> c � <br /> _.�.. ._, r`-- r�� �.�` Com` ^ir, p"�^ !1..T'. �� .��, !�� !�> � �•1 1�� ��1' r.a�r ^� �� <br />