My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006227
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600127
>
SU0006227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 12:22:30 PM
Creation date
9/6/2019 10:17:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006227
PE
2620
FACILITY_NAME
PA-0600127
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600127\SU0006227\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
985
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of n <br /> O O <br /> 1p <br /> a a College Park at Mountain House Specific Plan III <br /> r, y Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation Implementation&Verification <br /> 3 Responsibility Action Date Completed <br /> = 4.2-4 Land Use and Agriculture—Conflict After San Joaquin County <br /> Substantially with Existing Agricultural discontinuance of and the developer <br /> e Zoning or Williamson Act Contracts interim land <br /> The project applicants shall implement the disposal <br /> o following mitigation measure: <br /> At such time as the interim land disposal of <br /> treated wastewater at the Pombo property is <br /> discontinued, GNK,LLC shall remove the <br /> 30-acre storage pond and restore the <br /> storage-pond site to agricultural use (i.e., <br /> feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction Developer, in <br /> Adjacent Agricultural Operations coordination with <br /> Before development, the project developers BBID <br /> shall provide for the continued provision of <br /> irrigation water to downstream agriculture <br /> reliant on the water from the canals by the <br /> 3 installation of pipelines and other means. <br /> s The filling of the irrigation canals shall be <br /> o' <br /> = approved by BBID. <br /> 3 <br /> 4.6 CULTURAL RESOURCES <br /> 0 <br /> 4.6-2 Cultural rResources—Potential During San Joaquin County <br /> Destruction/Damage to Undiscovered Cultural construction and the developer, <br /> Resources in conjunction with <br /> If discovery of unknown cultural materials is qualified <br /> made during construction, ground-disturbing archaeologist, if <br /> T activities at the construction site where the needed, <br /> 3 discovery was made shall be halted.The College <br /> Park developers or construction contractor shall <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.