Laserfiche WebLink
of n <br /> O O <br /> 1p <br /> a a College Park at Mountain House Specific Plan III <br /> r, y Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation Implementation&Verification <br /> 3 Responsibility Action Date Completed <br /> = 4.2-4 Land Use and Agriculture—Conflict After San Joaquin County <br /> Substantially with Existing Agricultural discontinuance of and the developer <br /> e Zoning or Williamson Act Contracts interim land <br /> The project applicants shall implement the disposal <br /> o following mitigation measure: <br /> At such time as the interim land disposal of <br /> treated wastewater at the Pombo property is <br /> discontinued, GNK,LLC shall remove the <br /> 30-acre storage pond and restore the <br /> storage-pond site to agricultural use (i.e., <br /> feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction Developer, in <br /> Adjacent Agricultural Operations coordination with <br /> Before development, the project developers BBID <br /> shall provide for the continued provision of <br /> irrigation water to downstream agriculture <br /> reliant on the water from the canals by the <br /> 3 installation of pipelines and other means. <br /> s The filling of the irrigation canals shall be <br /> o' <br /> = approved by BBID. <br /> 3 <br /> 4.6 CULTURAL RESOURCES <br /> 0 <br /> 4.6-2 Cultural rResources—Potential During San Joaquin County <br /> Destruction/Damage to Undiscovered Cultural construction and the developer, <br /> Resources in conjunction with <br /> If discovery of unknown cultural materials is qualified <br /> made during construction, ground-disturbing archaeologist, if <br /> T activities at the construction site where the needed, <br /> 3 discovery was made shall be halted.The College <br /> Park developers or construction contractor shall <br /> I <br />