Laserfiche WebLink
T <br /> ' n <br /> o f <br /> College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation Implementation&Verification <br /> o Responsibility Action Date Completed <br /> a 4.7 DRAINAGE <br /> A <br /> N <br /> 4.7-2 Drainage—Result in Flooding or Exceed the Before construction Developer <br /> ,e Capacity of the Storm-drain System <br /> o The College Park developers shall expand <br /> o WQB I as required to accommodate runoff from <br /> 3 the College Park project, or shall provide the <br /> required on-site retention in-lieu of the <br /> required expansion of WQB 1, before <br /> development of those portions of <br /> Neighborhoods B and D to be served by the <br /> DeAnza Boulevard and Mountain House <br /> Parkway storm-drain systems. <br /> 4.8 WATER QUALITY <br /> 4.8-1 Water Quality—Potential Temporary NOI(s) submitted to San Joaquin County <br /> Construction-Related Water Quality Effects the Central Valley and the developer, <br /> The College Park developers shall consult with RWQCB before in coordination with <br /> the Central Valley Regional Water Quality beginning of the Central Valley <br /> Control Board (RWQCB) to acquire the applicable ground- RWQCB <br /> o appropriate regulatory approvals that may be disturbing or <br /> onecessary to obtain Section 401 water quality dewatering <br /> a certification, ensure compliance with the State activities; water <br /> L2. <br /> Water Resources Control Board (SWRCB) quality <br /> statewide National Pollutant Discharge performance <br /> o Elimination System (NPDES) stormwater permit standards <br /> for general construction activity and the Central established before <br /> ae. Valley RWQCB NPDES permit for construction construction begins <br /> 5, :o dewatering activity, and obtain any other <br /> necessary site-specific WDRs or waivers issued <br /> - pursuant to the Porter–Cologne Act. As <br /> �— <br />