Laserfiche WebLink
c . <br /> vo <br /> College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> g 3 Implementation <br /> Implementation&Verification <br /> mentat <br /> i g Mitigation Measure Timing/Schedule Responsibilityment <br /> o Action Date Completed <br /> orequired under the NPDES stormwater permit <br /> for general construction activity, the project <br /> applicant shall prepare a Stormwater Pollution <br /> • Prevention Plan (SWPPP)and any other <br /> s necessary engineering plans and specifications <br /> 0 <br /> for pollution prevention and control. The <br /> SWPPP and other appropriate plans shall: <br /> Identify and specify the use of erosion and <br /> sediment control Best Management <br /> Practices (BMPs), means of waste disposal, <br /> implementation of approved'local plans, <br /> non-stormwater management controls, <br /> permanent postconstruction BMPs, and <br /> inspection and maintenance responsibilities; <br /> Specify the pollutants that are likely to be <br /> used during construction that could be <br /> present in stormwater drainage and non- <br /> stormwater discharges; <br /> Specify BMP inspection protocols to ensure <br /> that the BMPs are effective and ensure that <br /> o the monitoring is conducted if nonvisible <br /> pollutants are inadvertently discharged into <br /> '• stormwater. <br /> a Identify construction techniques that will <br /> reduce the potential for runoff; <br /> Identify the erosion and sedimentation <br /> control measures to be implemented; <br /> Specify spill prevention and contingency <br /> v <br /> 3 � measures; <br /> Identify the types of materials used for <br />