Laserfiche WebLink
a• College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> = <br /> Mitigation MeasureTiming/ScheduleImplementation <br /> MititiMrImplementation 8 Verification <br /> Responsibility Action Date Completed <br /> a <br /> 'a County Environmental Health Department <br /> m <br /> � before project construction activities in the <br /> contaminated area. <br /> Project construction activities at hazardous <br /> S materials sites #3 and 7 (identified in Figure <br /> 4.9-2 and Table 4.9-1 of the EIR) shall occur <br /> only after any contamination that may exist <br /> at these sites has been fully remediated to the <br /> satisfaction of the County Environmental <br /> Health Department, the status of the sites has <br /> been changed to "no further action <br /> p <br /> required" in the regulatory agency databases, <br /> and the facilities that are the source of any <br /> contamination have been removed in <br /> accordance with applicable regulations.The <br /> project developers may attempt to advance <br /> the above, if they desire,by conducting their <br /> own investigations of these sites in <br /> coordination with the property owners and <br /> regulatory agencies, and working with the <br /> regulatory agencies to accomplish the above. <br /> oBefore demolition, renovation, or <br /> R. modification of structures on the project site <br /> = and off-site infrastructure sites constructed <br /> ^ „ before 1981 (parcels containing such <br /> =o` structures are listed in Table 4.9-2 of the <br /> �• EIR), the project developers shall contract <br /> o^ o with qualified hazardous materials experts to <br /> survey these buildings for asbestos and lead- <br /> based paint. Demolition, renovation, or <br />