My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006227
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600127
>
SU0006227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 12:22:30 PM
Creation date
9/6/2019 10:17:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006227
PE
2620
FACILITY_NAME
PA-0600127
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600127\SU0006227\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
985
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a• College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> = <br /> Mitigation MeasureTiming/ScheduleImplementation <br /> MititiMrImplementation 8 Verification <br /> Responsibility Action Date Completed <br /> a <br /> 'a County Environmental Health Department <br /> m <br /> � before project construction activities in the <br /> contaminated area. <br /> Project construction activities at hazardous <br /> S materials sites #3 and 7 (identified in Figure <br /> 4.9-2 and Table 4.9-1 of the EIR) shall occur <br /> only after any contamination that may exist <br /> at these sites has been fully remediated to the <br /> satisfaction of the County Environmental <br /> Health Department, the status of the sites has <br /> been changed to "no further action <br /> p <br /> required" in the regulatory agency databases, <br /> and the facilities that are the source of any <br /> contamination have been removed in <br /> accordance with applicable regulations.The <br /> project developers may attempt to advance <br /> the above, if they desire,by conducting their <br /> own investigations of these sites in <br /> coordination with the property owners and <br /> regulatory agencies, and working with the <br /> regulatory agencies to accomplish the above. <br /> oBefore demolition, renovation, or <br /> R. modification of structures on the project site <br /> = and off-site infrastructure sites constructed <br /> ^ „ before 1981 (parcels containing such <br /> =o` structures are listed in Table 4.9-2 of the <br /> �• EIR), the project developers shall contract <br /> o^ o with qualified hazardous materials experts to <br /> survey these buildings for asbestos and lead- <br /> based paint. Demolition, renovation, or <br />
The URL can be used to link to this page
Your browser does not support the video tag.