Laserfiche WebLink
= o <br /> oCollege Park at Mountain House Specific Plan III <br /> oMitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation Implementation 8 Verification <br /> Responsibility Action Date Completed <br /> e <br /> cmodification of any structures identified as <br /> containing asbestos or lead-based paint shall <br /> e be performed by a licensed asbestos and <br /> lead-based paint abatement contractor in <br /> o accordance with applicable regulations. <br /> B 4.9-4 Public Health and Safety-Locate a School Site During design Developer and a <br /> in an Area of Potential Hazards phase qualified hazardous <br /> The College Park developers shall have a materials expert, <br /> preliminary Endangerment Assessment consultation with <br /> (PEA) prepared by a qualified hazardous CDE <br /> _ materials consultant for the school located <br /> near the Lucky J Dairy, if required by <br /> California Department of Education (CDE). <br /> The PEA shall be prepared in accordance <br /> with CDE and Department of Toxic <br /> Substances Control (DISC) requirements <br /> and shall be reviewed and approved by CDE, <br /> DTSC, the SJCCDD, and the Lammersville <br /> School District. If these agencies determine, <br /> 3 <br /> based on the PEA,that the school site does <br /> not meet CDE siting requirements, the <br /> proposed school shall be developed at a <br /> u; different location within the College Park <br /> 0 <br /> a site,subject to clearance by a new PEA to be <br /> funded by the developers'If the new school <br /> site is required, the developers shall be <br /> responsible for processing the required <br /> $ o <br /> amendment C6 the College Park Specific Plan <br /> 3 III and obtaining and dedicating the new <br /> school site to the school district. The <br />