Laserfiche WebLink
� s <br /> $ College Park at Mountain House Specific Plan III <br /> e <br /> F Mitigation Monitoring and Reporting Program <br /> ss <br /> Implementation Implementation&Verification <br /> s Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> 0 <br /> 8 paid in the amount determined by SJCOG activities) <br /> during the application and review Process for <br /> each project under College Park. During the <br /> • SJMSCP application process, SJCOG will <br /> o determine whether that specific project site <br /> supports suitable habitat for loggerhead shrike, <br /> California horned lark, or tricolored blackbird. <br /> If SJCOG determines suitable habitat is present <br /> on or adjacent to a given project site, the <br /> following SJMSCP incidental take avoidance <br /> and minimization measures shall be <br /> implemented by the project applicants in <br /> consultation with a qualified biologist. <br /> Loggerhead.Shrike. If project construction <br /> begins during the nesting season (April 1- <br /> August 31),.pre-construction surveys shall <br /> be conducted during the nesting season in <br /> suitable nesting habitat within 100 feet of <br /> o areas of project activity. The survey shall be <br /> conducted within the 2 weeks before <br /> construction or tree removal begins.A <br /> o' setback of 100 feet from loggerhead shrike <br /> nesting areas shall be established and <br /> a maintainedduring the nesting season for <br /> the period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or <br /> other ground-disturbing activities must <br /> 3 begin during the nesting season in the <br /> presence of nests that are known to be <br />