My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006227
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600127
>
SU0006227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 12:22:30 PM
Creation date
9/6/2019 10:17:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006227
PE
2620
FACILITY_NAME
PA-0600127
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600127\SU0006227\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
985
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 �^ <br /> s a <br /> o <br /> o College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> 0 <br /> i occupied. Setbacks shall be marked by <br /> cbrighdy colored temporary fencing. <br /> �• California Horned Lark and Tricolored <br /> Blackbird. If project construction begins <br /> m during the nesting season (April 1–August <br /> 3 31), pre-construction surveys shall be <br /> conducted during the nesting season in <br /> suitable nesting habitat within 500 feet of <br /> areas of project activity.A setback of 500 <br /> feet from California horned lark and <br /> tricolored blackbird nesting areas shall be <br /> a established and maintained during the <br /> nesting season for the period encompassing <br /> nest building and continuing until <br /> fledglings leave nests.This setback applies <br /> whenever construction or other ground- <br /> disturbing activities must begin during the <br /> nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary <br /> fencing. <br /> 3 <br /> 4.10-9 Biological Resources—Conversion of San Before construction San Joaquin <br /> Joaquin Kit Fox Habitat and Possible (surveys shall be County, in <br /> oOccupied Den Destruction conducted 2 weeks consultation with <br /> The College Park developers shall request to 30 days before SJCOG and DFG <br /> g` coverage under the SJMSCP, and fees shall be construction <br /> ^' paid in the amount determined by San Joaquin activities) <br /> 0 o County of Government(SJCOG)during the <br /> application and review process for each project <br /> under College Park. Because the entire College <br />
The URL can be used to link to this page
Your browser does not support the video tag.