Laserfiche WebLink
3 �^ <br /> s a <br /> o <br /> o College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> 0 <br /> i occupied. Setbacks shall be marked by <br /> cbrighdy colored temporary fencing. <br /> �• California Horned Lark and Tricolored <br /> Blackbird. If project construction begins <br /> m during the nesting season (April 1–August <br /> 3 31), pre-construction surveys shall be <br /> conducted during the nesting season in <br /> suitable nesting habitat within 500 feet of <br /> areas of project activity.A setback of 500 <br /> feet from California horned lark and <br /> tricolored blackbird nesting areas shall be <br /> a established and maintained during the <br /> nesting season for the period encompassing <br /> nest building and continuing until <br /> fledglings leave nests.This setback applies <br /> whenever construction or other ground- <br /> disturbing activities must begin during the <br /> nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary <br /> fencing. <br /> 3 <br /> 4.10-9 Biological Resources—Conversion of San Before construction San Joaquin <br /> Joaquin Kit Fox Habitat and Possible (surveys shall be County, in <br /> oOccupied Den Destruction conducted 2 weeks consultation with <br /> The College Park developers shall request to 30 days before SJCOG and DFG <br /> g` coverage under the SJMSCP, and fees shall be construction <br /> ^' paid in the amount determined by San Joaquin activities) <br /> 0 o County of Government(SJCOG)during the <br /> application and review process for each project <br /> under College Park. Because the entire College <br />