Laserfiche WebLink
Lam.+ <br /> 00 <br /> a o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 3 Implementation Implementation&Verification <br /> ? $ Mitigation Measure Timing/Schedule <br /> � Responsibility Adion Date Completed <br /> a <br /> _ botanist for avoidance.during <br /> � <br /> construction activities <br /> $ I£special-status plant populations cannot <br /> be avoided, consultations with DFG <br /> o and/or USFWS may be required, <br /> depending on the Usting status of the <br /> species present. These consultations shall <br /> determine appropriate mitigation <br /> measures for any populations that would <br /> be affected by the implementation of the <br /> proposed project.Appropriate measures <br /> may include the creation of off-site <br /> populations through seed collection or <br /> transplanting preservation and <br /> enhancement of existing populations, or <br /> restoration or creation of suitable habitat <br /> in sufficient quantities to compensate for <br /> the impact. <br /> 'o <br /> California Red-Legged Frog Before construction Sanjoaquin <br /> o Before project activity, USFWS shall be County,in <br /> '— consulted to determine whether widening of consultation with <br /> Grant Line Road has potential to adversely USFWS <br /> affect California red-legged frog. It may be <br /> necessary to conduct a formal habitat <br /> o assessment and surveys to make such a <br /> determination. If it is determined that <br /> v adverse effects are unlikely to occur, no <br /> o > further mitigation shall be required. <br /> e If it is determined that adverse effects to <br />