Laserfiche WebLink
3 r^ <br /> a <br /> o f <br /> -o' College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> 3 Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Res nsihili <br /> Pa N Action Date Completed <br /> 0 <br /> ii California red-legged frog could occur, <br /> consultation with USFWS shall be conducted, <br /> and authorization for incidental take could <br /> be required. Specific mitigation measures <br /> S would be developed during the consultation <br /> 3 process. Measures designed to avoid and <br /> minimize take to the greatest extent feasible <br /> shall be developed and implemented. These <br /> may include limiting activities to certain <br /> seasons, minimizing vegetation removal and <br /> in-water construction activities, conducting <br /> N pre-construction surveys, and conducting <br /> daily surveys and monitoring of construction <br /> areas. If necessary, appropriate <br /> compensation for loss of habitat and other <br /> adverse effects would also be developed. This <br /> n <br /> could include measures such as enhancement <br /> A <br /> of existing habitat and creation of additional <br /> habitat. <br /> -o <br /> Swainson's Hawk Before construction San Joaquin <br /> 3 If project construction begins during the (surveys shall be County, in <br /> Swainson's Hawk nesting season, as defined conducted 2 weeks consultation with <br /> o by DFG (March 1 to September 15), pre- prior to DFG <br /> N c construction surveys shall be conducted in construction <br /> ��, areas of suitable nesting habitat within 0.5 activities) <br /> amile of project activity. Surveys shall be <br /> conducted by a qualified biologist within the <br /> 0 0 2 weeks before construction or tree removal <br /> begins. If no active nests are found, no <br /> further mitigation shall be required. <br />