Laserfiche WebLink
3 m <br /> a <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation 8 Yeriftcotion <br /> �• Mitigation Measure Timing/Schedule Res onsihiliry <br /> p Action Date Completed <br /> 0 <br /> Abiologist confirms that the nest is no longer <br /> active. The size of the buffer area may be <br /> adjusted if a qualified biologist and DFG <br /> 7 determine it would not be likely to adversely <br /> affect the nesting pair. DFG shall also be <br /> 0 <br /> � consulted to determine if it is necessary to <br /> temporarily preserve foraging habitat(in <br /> addition to the buffer area) until the nest is <br /> no longer active. <br /> If feasible, 250-foot buffer areas shall also be <br /> established around all other occupied <br /> p burrows. I£this is not feasible, DFG shall be <br /> consulted to determine whether smaller <br /> buffer areas and/or relocation of owls is <br /> necessary. Relocation may include passive <br /> techniques, such as use of one-way doors to <br /> encourage owls to move to alternative <br /> n <br /> burrows outside the impact area, or capture <br /> and movement of owls to specific mitigation <br /> 0 <br /> sites. <br /> 3 Other Nesting Raptors Before construction San Joaquin <br /> If project construction begins during the (surveys shall be County, in <br /> raptor nesting season (February 15 to August conducted 2 weeks consultation with <br /> c31), pre-construction surveys shall be prior to DFG <br /> conducted by a qualified biologist in areas of construction <br /> suitable nesting habitat within 500 feet of activities) <br /> project activity. Surveys shall be conducted <br /> o^ c within 2 weeks before the beginning of <br /> z = construction or tree removal. If no active <br /> nests are found,no further mitigation shall <br /> _ �_. _... .-� -..n r--- '--�-. rte. .—� .•-� �+, r--� .�, r—. .,_�. .�� <br />