Laserfiche WebLink
_ <br /> a o <br /> College Park at Mountain House Specific Plan III <br /> oe Mitigation Monitoring and Reporting Program <br /> oImplementation Implementation&Verification <br /> z Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> 0 <br /> '= be required. <br /> If active nests are found, impacts shall be <br /> avoided by establishment of appropriate <br /> buffers. No project activity shall commence <br /> X. <br /> within the buffer area until a qualified <br /> biologist confirms that the nest is no longer <br /> active. DFG guidelines recommend <br /> implementation of 500-foot buffers, but the <br /> size of the buffer may be adjusted if a <br /> qualified biologist and DFG determine it <br /> would not be likely to adversely affect the <br /> nest. Monitoring of the nest by a qualified <br /> biologist may be required if the activity has <br /> potential adversely affect the nest. <br /> San Joaquin Kit Fox Before construction San Joaquin <br /> To minimize thepotential.for destruction of (surveys to be County, in <br /> an occupied burrow.and direct take of a kit completed no more consultation with <br /> fox,a pre-construction survey for active and than 30 days and USFWS and DFG <br /> o potential kit fox dens shall be conducted by a no less than 14 days <br /> '= qualified'biologist no more than 30 days and before construction <br /> ono less than 14 days before the beginning of activities) <br /> o ,round disturbance or construction activity. <br /> The survey shall include all undeveloped <br /> areas in and within 100 feet of development <br /> and staging areas. Potential dens shall be <br /> monitored to determine if they are active, in <br /> accordance with methods presented in the <br /> 'g c StandardizedRecommendations for Protection of <br /> 3 the San Joaquin Kit Fox Before or During Groun <br /> Disturbance (USFWS 1999). <br />