Laserfiche WebLink
0 0 <br /> o College Park at Mountain House Specific Plan III <br /> ao Mitigation Monitoring and Reporting Program <br /> 3Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> 0 <br /> = vacated the den and then only after <br /> € consultation with USFWS. A 250-foot buffer <br /> R zone shall be maintained around natal dens <br /> Qc until the biologist determines that the den <br /> 0 <br /> has been vacated. <br /> Additional provisions of the Standardized <br /> Recommendations for Protection of the San <br /> Joaquin Kit Fox Before or During Ground <br /> Disturbance (USFWS 1999), including <br /> those for educating construction workers <br /> regarding kit fox, keeping heavy <br /> equipment operating at safe speeds, and <br /> checking construction pipes for kit fox <br /> occupation during construction,shall <br /> also be implemented. <br /> Jurisdictional Waters of the United States Before San Joaquin <br /> • The College Park Developers shall Construction County, in <br /> 3 implement Mitigation Measure 4.10-10. consultation with <br /> 0 <br /> USACE and/or <br /> 3 RWQCB, and DIG <br /> 0 <br /> 4.11. TRAFFIC <br /> 0 <br /> 4.11.1 Transportation—Effects on 2025 Cumulative Before construction San Joaquin County <br /> o_ <br /> With-Project Conditions on Anticipated <br /> A Network <br /> For consistency with previously adopted <br /> roadway standards, the County shall extend the <br /> standard of LOS D to the segment of Byron <br /> 3 Road east of Grant Line Road, <br /> Because Byron Road is a major regional arterial <br />