Laserfiche WebLink
3 ^+ <br /> o <br /> College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> o Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> 0 <br /> serving the area, the County shall extend <br /> A <br /> a implementation of Mountain House Master Plan <br /> 0 <br /> (MHMP) EIR mitigation measure 4.12-5(e) to <br /> apply to Byron Road east of Grant Line Road. <br /> $ 4.12. AIR QUALITY <br /> i3 <br /> B <br /> 4.12.1 Air Quality—Generation of Temporary, Short- Before construction San Joaquin <br /> Term Construction Emissions of Criteria Air begins and during County, the <br /> Pollutants construction developer, and <br /> The College Park developers shall implement the SJVAPCD <br /> latest version of the SJVAPCD construction- <br /> emissions control measures during construction <br /> (see"Regulatory Setting," above). <br /> The latest version of the San Joaquin Valley Air <br /> Pollution Control District(SJVAPCD)control <br /> measures are induded in the Guide for Assessing <br /> and Mitigating Air Quality Impacts (SJVAPCD 1998) <br /> o and repeated in the "Regulatory Setting" <br /> subsection. The SJVAPCD periodically revises its <br /> c control measures. Development under College <br /> F Park would be required by the SJVAPCD to <br /> oimplement the current version of the measures at <br /> the time individual development applications are <br /> received by the County for development under <br /> = College Park. <br /> 0 <br /> o = <br /> e4.12-2 Air Quality—Potential Generation of Toxic Air Before construction San Joaquin <br /> Contaminants(IACs) begins and during County, the <br /> M Asbestos—The College Park developers construction developer, and <br /> > shall implement Mitigation Measure 4.9-1. SJVAPCD <br /> Mobile-Source TAC Emissions—The <br />