Laserfiche WebLink
3 � <br /> o <br /> o College Park at Mountain House Specific Plan III <br /> e <br /> o Mitigation Monitoring and Reporting Program <br /> a <br /> o Implementation Implementation 8 Verification <br /> �• Mitigation Measure Timing/Schedule Responsibility Action Date Completed <br /> e <br /> a 4.13. NOISE <br /> A <br /> 4.13-1 Noise—Generation of Temporary Construction During San Joaquin County <br /> a Noise construction and the developer <br /> 0 <br /> Limit project construction activities to the <br /> o hours between 6:00 a.m. and 9:00 p.m. <br /> 3 Comply with the San Joaquin County <br /> Development Title for all construction <br /> activities. <br /> Equip all construction vehicles or <br /> equipment, fixed or mobile,with properly <br /> operating and maintained mufflers and <br /> �o acoustical shields or shrouds, in accordance <br /> with manufacturers' recommendations. <br /> Arrange all construction equipment and <br /> truck routes to minimize travel adjacent to <br /> occupied residences. <br /> Locate stationary construction equipment <br /> and staging areas as far as possible from <br /> sensitive receptors.Temporary acoustic <br /> barriers may be installed around stationary <br /> equipment, if necessary. <br /> 4.13.2 Noise—Generation of New Stationary-Source During design San Joaquin County <br /> �• Noise phase and during and the developer <br /> The project applicants shall incorporate the construction <br /> o measures identified below into the project <br /> e. <br /> design. <br /> v Commercial,Office,and Industrial Uses <br /> 0 0 <br /> a — Industrial and commercial land uses proposed <br /> I I r---+ P—M r-- r- F---n e—a r--� r1o", r--" -tea .mow <br />