Laserfiche WebLink
a o <br /> 8 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> g Implementation <br /> Mitigation Measure Timing/Schedule Implementation&Verification <br /> Responsibility Action Dote Completed <br /> a <br /> = as parr of the College Park project shall be <br /> designed to ensure that outdoor equipment <br /> does not result in an exceedance of 55 dBA L,q <br /> 3• during daytime hours (7:00 a.m. to 10:00 p.m.) <br /> -v or 50•dBA L,q during nighttime hours (10:00 <br /> p.m. to 7:00 a.m.) at off-site noise-sensitive <br /> receptors. In addition, design and operational <br /> standards shall be established to minimize noise <br /> generated by loading dock activities from <br /> adversely affecting planned and existing off-site <br /> noise-sensitive land uses. Design and <br /> operational measures may include: <br /> Enclose outdoor noise-generating <br /> equipment and/or setback from the <br /> property line. <br /> Locate buildings and structures such that <br /> they shield off-site sensitive receptors from <br /> 3 on-site noise sources, including loading <br /> 0 <br /> dock activity. <br /> Enclose loading dock areas <br /> o Limit loading dock activity, including <br /> o' delivery truck arrivals and departures, to <br /> a between 7;00 a.m. and 10:00 p.m. at those <br /> a loading docks with direct line of site of <br /> noise-sensitive receptors within a distance of <br /> 1;000 feet.Activity at all other loading docks <br /> shall be limited to the hours between 5:00 <br /> m a.m. and 10:00 p.m. <br /> Noisestudies,including on-site sound level <br /> measurements, shall be conducted to ensure <br />